BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Renovation of a mixed-use development in Chicago, Illinois. Completed plans call for the renovation of a educational facility; and laboratory facility.

Renovate Welding Lab, Kennedy King College. MBE/WBE Subcontracting and Supplier Goals Apply. DESCRIPTION: The project consists of the renovation of an existing 3,700 SF welding lab located on the third floor of the Dawson Institute. The scope includes selective demolition, replacement and addition to rooftop mechanical equipment, mechanical and gas piping distribution systems, modifications to power and lighting systems and the replacement of existing welding booths.

Bid Results

Laboratories

$1,214,000.00

Public - State/Provincial

Renovation

35

17

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
457
Active Projects
257
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

Project location map

6301 S Halsted St, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.