Renovation of a water / sewer project in Lexington, Kentucky. Completed plans call for the renovation of a water / sewer project.
Town Branch Primary Digester Roof Leak Repairs The primary digester complex at Town Branch Wastewater Treatment Plant (TBWWTP) underwent a process upgrade between 2018 and 2020. Various equipment including digester covers and digester gas equipment were rehabilitated or replaced. The project also included roofing replacement. During the upgrade the existing steel floating dual-deck cover on Digester No. 2 was demolished and replaced with a dual membrane gasholding cover. The dual membrane gasholding cover was specified in anticipation of future implementation of digester gas beneficial use. To facilitate installation of the membrane cover, a concrete mounting ring was formed and placed at the top of the inside tank wall of Primary Digester No. 2. The membrane cover mounted and anchored to the concrete mounting ring has inadvertently introduced a path for water intrusion into the digester control building adjacent to the tank wall. The improvements specified in this project address this water intrusion by modifying the concrete mounting ring and reflashing the roofing/tank wall/digester control building interface. To facilitate this work, the membrane cover will need to be removed and later reinstalled. In addition to the water intrusion due to the mounting ring, damage to through wall flashing where the lower digester control building roof abuts Digester No. 2 has led to additional water intrusion into the building. Masonry work and flashing replacement are required in this area. The TBWWTP Primary Digester No. 2 Roof Leak Repairs includes labor, materials, tools, equipment, testing, and all other incidentals to complete the Work. Bidder shall subcontract with the membrane cover manufacturer, Evoqua Water Technologies (Evoqua), to remove and reinstall the cover. The ultimate delineation of tasks shall be coordinated between Evoqua and the Bidder to preserve Evoqua's membrane cover warranty coverage. While not intended to be all-inclusive, following is a list of required tasks with the anticipated responsible party in parentheses:A. Coordination with Owner to take Digester No. 2 out of service. (Bidder) B. Removal of cover membranes, restraint cables, mounting hardware, and associated hoses. Inventory of hardware and equipment to be stored by Owner for reuse. (Evoqua) C. Removal of lightning protection system, metal drip edge, and all other appurtenances interfering with access to the concrete mounting ring. (Bidder) D. Modifications to concrete mounting ring, roofing, and flashing and reinstallation of lightning protection system. (Bidder) E. Reinstallation of membrane cover with all associated equipment. Performance of pressure testing and membrane cover startup procedures. (Evoqua) F. Provide assistance to Owner with returning Digester No. 2 to service. (Evoqua and Bidder) G. Make masonry wall repairs at lower digester control building roof. (Bidder). No official Pre-Bid meeting will be held. No Bidder may withdraw his Bid for a period of sixty (60) calendar days after the closing date for receipt of Bids. Errors and omissions will not be cause for withdrawal of Bid without forfeit of Bid Bond. Bids may be withdrawn via Ion Wave prior to the closing date of receipt of bids. Bid shall be accompanied by a certified check, cashier's check, or bid bond payable to the Lexington-Fayette Urban County Government in an amount not less than five percent (5%) of the base bid. Bid bond shall be executed by a Surety Company authorized to do business in the Commonwealth of Kentucky and countersigned by a licensed Kentucky Resident Agent, representing the Surety Company. Contractor shall use standard Performance and Payment Bond forms such as documents provided with this contract book or AIA form A312-1984 (or later). Each document will be for 100% of the Contract Bid Amount. Question Deadline 03/13/2025 at 4:00 PM ET All questions shall be submitted via online. The successful Bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within ten (10) days after he has received notice of the acceptance of his Bid, shall forfeit to the OWNER, as liquidated damages for such failure or refusal, the security deposited with his Bid. The Procurement Agent for the LFUCG reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the LFUCG may be served.
Award
Water / Sewer
$844,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
April 28, 2025
301 Jimmie Campbell Dr, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Mar 18 2025
Lexington, KY
Bid Date: Mar 21 2025
Lexington, KY
Bid Date: Mar 21 2025
Lexington, KY
--
Lexington, KY
--
Lexington, KY
Bid Date: Mar 19 2025
Lexington, KY
Bid Date: Mar 28 2025
Lexington, KY
Bid Date: Mar 27 2025
Lexington, KY
Bid Date: Mar 17 2025
Lexington, KY
Bid Date: Mar 17 2025
Lexington, KY
Bid Date: Mar 20 2025
Lexington, KY
Bid Date: Mar 26 2025
Lexington, KY
Bid Date: Mar 27 2025
Lexington, KY
Bid Date: Mar 12 2025
Lexington, KY
Bid Date: Mar 25 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.