EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Student Center East Tower is a high traffic building with binary toilets on floors 4 - 7.The toilets rooms are well worn and do not meet ADA standards. This project will renovate the binary restrooms on floors 6 and 7 to add fixture count and meet ADA and Building Code standards. Renovated restrooms for this Project will match design intent and materials at recently renovated restrooms on floors 4 and 5. This Project is located at: Student Center East Tower, 710 S. Halsted St., Chicago, IL 60607, Floors 6 and 7: Two existing binary restrooms per floor. Each bidder shall prequalify with the Owner in accordance with the General Instructions to Bidders (Document 00 20 00). The project-specific prequalification (Document 00 46 00) deadline is 4:00 p.m. prevailing time on 3/21/2025. Question Deadline 04/11/2025 Additional information about this project can be obtained from Daniel Viger, dviger1@uic.edu,312-355- 0198 Deadline for bidder Requests for Information (RFI) is 7 calendar days prior to Bid Opening date and time, unless otherwise specified. General Work 30 MBE/WBE/PBE % The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner.

GC Bidding

Educational

$450,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
198
Bidding Soon
2,204
All Active Projects
1,058
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

May 19, 2025

img_map_placeholder

710 S Halsted St, Chicago, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Student Center East Tower Restroom Renovation Floors 6 and 7

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.