BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2025 at 8:00 PM

Updated September 21, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Marion, South Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

SC File NO(S).: 3462420 PCN: P041393 Project No.: P041393 DBE Goal Percent: 6.00% Approx. Length (miles): 0.2350 CO(S).: Completion Date: 11/30/2026 Days The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an Electronic Bond is Utilized, the Bond ID number must be provided on the Surety 2000 or Tinubu (SurePath) Network electronic bond form. No Other Form of Proposal Guaranty Will Be Accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The south Carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SC DOT - 110 - US 76 Bridge Replacement Over Catfish Branch The Contractor is hereby advised that Section 105.06 is hereby revised in that the Contractor will be responsible for relocating those utility facilities shown in the Plans and Proposal. This work shall be performed in accordance with the drawings, specifications, rules and regulations of the utility owner When bid items for smooth wall pipe are listed in the EBS file and/or proposal, the SCDOT will allow the use of reinforced concrete pipe, spiral ribbed aluminum pipe or high density polyethylene pipe in accordance with the specifications found in SC-M-714 (latest edition), the Standard Drawings, and this Special Provision. The plans may indicate reinforced concrete pipe only and are hereby superseded by this Special Provision.

Award

Bridges / Tunnels

$7,585,693.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

88

14

15

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
49
Bidding Soon
740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

October 13, 2025

Project location map

US-76, Marion, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.