BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2025 at 8:00 PM

Updated November 8, 2025

Site work and renovation of a water / sewer project in Cocoa Beach, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project Consists of Three (3) Lift Station Rehabilitation Projects. The Project Descriptions Are Listed Below. The Projects Include, but Are Not Limited to, the Following Work: Lift Station 3 Rehabilitation: Removal of Existing Riser Piping, Underground Valve Vault and Identified Electrical Equipment. Installation of Above Ground Stainless Steel Piping Assembly, New Stainless Steel Rising Piping, Approximately 20 Linear Feet of 6-inch C900 Dr-18 Pvc Force Main, Temporary Bypass Pumping, Abandonment of Existing 6-inch Force Main Pipe, Associated Electrical Upgrades, and Site Restoration. Lift Station 6 Rehabilitation: Removal of Existing Riser Piping, Underground Valve Vault, and Identified Electrical Equipment. Installation of Above-ground Stainless Steel Piping Assembly, New Stainless Steel Rising Piping, Concrete Doghouse Manhole, Approximately 25 Linear Feet of 6-inch Force Main Pipe, Water Service Connection, Associated Electrical Upgrades, and Site Restoration. Lift Station 15 Rehabilitation: Removal of Existing Riser Piping, Top, Slab, Underground Valve Vault, and Identified Electrical Equipment. Installation of Above-ground Stainless Steel Piping Assembly, New Stainless Steel Rising Piping, Approximately 25 Linear Feet of 6-inch C900 Dr-18 Pvc Force Main, Temporary Bypass Pumping, Lift Station Top Slab and Hatch With Fall Protection, 5-foot Diameter Doghouse Manhole, Removal of Existing 6-inch Diameter Force Main Pipe, Associated Electrical Upgrades, and Site Restoration. Bids Will Be Received on a Unit Price Basis as Described in the Contract Documents. A Bid Bond is Not Required. Performance Bond Pursuant to 255.05 Fl. Statute in the Amount of the Total Bid Shall Be Required. The Proposal Shall Be Firm for a Period of Ninety (90) Days From the Date of the Public Opening. The engineer's estimate is $2.9 million. Question Deadline 06/27/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Kimley-Horn and Associates, Inc. Attention: Alyssa Colby, P.E. 7341 Office Park Place, Suite 102 Melbourne, FL 32940 Phone: (321)-335-6692 Email: alyssa.colby@kimley-horn.com Project No. 147965001, 147965002, 147965003 Bid Result : Lift Station 3 - US Water Services Corporation - $ 711,326 Lift Station 6- US Water Services Corporation - $ 810,426 Lift Station 15 - Southern Underground Industries, Inc - $ 1,063,690

Bid Results

Water / Sewer

$2,585,442.00

Public - City

Renovation, Site Work

80

29

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
91
Bidding Soon
1,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

September 16, 2025

Project location map

Multiple Locations, Cocoa Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.