Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Demolition, site work and new construction of a sidewalk / parking lot in Cocoa Beach, Florida. Completed plans call for the demolition of a one-story above grade sidewalk / parking lot.

Replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The City at their discretion may decide to perform demolition; however, please supply a lump sum price within the schedule of unit prices. The new structure at South 7th Street will span approximately 237 feet and at Flagler Lane will span approximately 222 feet in length and be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. All construction materials, workmanship, and processes shall adhere strictly to the project's design drawings, specifications, and applicable codes and standards. Bidders must be licensed contractors in the State of Florida. A bid bond is not required. Question Deadline 12/19/2025 Deadline for Written Questions Any inquiries, suggestions, or requests concerning clarification or solicitation for additional information shall be submitted to the City in accordance with paragraph entitled PROJECT COORDINATOR below Brad Kalsow, Public Works and Water Reclamations Director Email: BKalsow@cityofcocoabeach.com The City will NOT respond to oral inquiries. Proposers may submit written, (e- mailed) inquiries regarding this RFP to the project coordinator. The scope of this project is to replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The City at their discretion may decide to perform demolition, however, please supply a lump sum price within the schedule of unit prices. The new structure South 7 th Street will span approximately 237 feet and Flagler Lane will span approximately 222 feet in length and be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. All construction materials, workmanship, and processes shall adhere strictly to the projects design drawings, specifications, and applicable codes and standards. Completely demolish and remove the existing dune crossover, including all landings, ramps, and related structural components. The demolition work must be carried out carefully to minimize disruption to the surrounding environment. o No fill material shall be transported off-site or brought onto the site, except for the temporary displacement of sand during pile installation. Sand disturbed during construction must be replaced to match existing grade and contours. o The City at their discretion may decide to perform demolition, however, please supply a lump sum price within the schedule of unit prices.

Award

Sidewalks / Parking Lot

$296,180.00

Public - City

Demolition, New Construction, Site Work

14

5

2

7

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
109
Bidding Soon
1,628
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2026

February 16, 2026

Project location map

Flagler Ln, Cocoa Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed