Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 3, 2026 at 7:00 PM
Updated January 4, 2026
Demolition, site work and new construction of a sidewalk / parking lot in Cocoa Beach, Florida. Completed plans call for the demolition of a one-story above grade sidewalk / parking lot.
Replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The City at their discretion may decide to perform demolition; however, please supply a lump sum price within the schedule of unit prices. The new structure at South 7th Street will span approximately 237 feet and at Flagler Lane will span approximately 222 feet in length and be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. All construction materials, workmanship, and processes shall adhere strictly to the project's design drawings, specifications, and applicable codes and standards. Bidders must be licensed contractors in the State of Florida. A bid bond is not required. Question Deadline 12/19/2025 Deadline for Written Questions Any inquiries, suggestions, or requests concerning clarification or solicitation for additional information shall be submitted to the City in accordance with paragraph entitled PROJECT COORDINATOR below Brad Kalsow, Public Works and Water Reclamations Director Email: BKalsow@cityofcocoabeach.com The City will NOT respond to oral inquiries. Proposers may submit written, (e- mailed) inquiries regarding this RFP to the project coordinator. The scope of this project is to replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The City at their discretion may decide to perform demolition, however, please supply a lump sum price within the schedule of unit prices. The new structure South 7 th Street will span approximately 237 feet and Flagler Lane will span approximately 222 feet in length and be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. All construction materials, workmanship, and processes shall adhere strictly to the projects design drawings, specifications, and applicable codes and standards. Completely demolish and remove the existing dune crossover, including all landings, ramps, and related structural components. The demolition work must be carried out carefully to minimize disruption to the surrounding environment. o No fill material shall be transported off-site or brought onto the site, except for the temporary displacement of sand during pile installation. Sand disturbed during construction must be replaced to match existing grade and contours. o The City at their discretion may decide to perform demolition, however, please supply a lump sum price within the schedule of unit prices.
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 2, 2026
February 16, 2026
Flagler Ln, Cocoa Beach, FL
Related To This Project
Cocoa Beach, FL
Bid Date: Jan 02 2026
Cocoa Beach, FL
Bid Date: Nov 07 2025
Cocoa Beach, FL
Bid Date: Sep 19 2025
Cocoa Beach, FL
Bid Date: Aug 08 2025
Cocoa Beach, FL
Bid Date: Sep 05 2025
Cocoa Beach, FL
Bid Date: Jul 18 2025
Cocoa Beach, FL
Bid Date: Jul 18 2025
Cocoa Beach, FL
Bid Date: Jun 20 2025
Cocoa Beach, FL
Bid Date: Jun 06 2025
Cocoa Beach, FL
Bid Date: Apr 16 2025
Cocoa Beach, FL
--
Cocoa Beach, FL
--
Cocoa Beach, FL
--
Cocoa Beach, FL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
