EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Chippewa Falls, Wisconsin. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bids for the above project will be received by the Highway Commissioner of Chippewa County. In general, the project consists of the deck replacement of one County bridge on CTH Q in the Town of Tilden. The project includes deck removal and replacement, new beam guard, and various other items necessary to complete the work as shown on the plans and included in the proposal and contract. A single prime bid will be received for the work. Approach roadway items including HMA paving, base aggregate, aggregate shouldering, earthwork, topsoil, culvert, and restoration will be completed by the Chippewa County Highway Department. Bidders shall be experienced in this type of work and be prequalified with the Wisconsin Department of Transportation for work in the class and amount of their bid or shall complete the Statement of Bidder's Qualifications and Bidders Proof of Responsibility. Bids must be accompanied by bid security in the amount of 10% of the maximum bid amount. Bid and bid security may not be withdrawn for a period of time as specified in the Special Provisions. Bid security will be retained if the Bidder is awarded the Work and fails to execute the Contract and furnish 100% Performance and Payment Bonds. This project is being funded by the State of Wisconsin Local Road Improvement Program (LRIP - CHIS). Prevailing wage rates are not applicable to this project. Chippewa County reserves the right to reject any or all bids and to waive informalities in any bid. Contractors should submit all questions concerning plans and/or proposals through online for the project you are bidding.

Award

Bridges / Tunnels

$472,353.00

Public - County

Paving, Site Work

51

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
38
Bidding Soon
334
All Active Projects
178
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

img_map_placeholder

County Hwy Q, Chippewa Falls, WI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Rehabilitation Project - CTH Q Bridge over Tilden Creek

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.