Renovation of a playground / park / athletic field in Eagan, Minnesota. Completed plans call for the renovation of a playground / park / athletic field.
SCOPE OF WORK The contractor is going to replace 1 set of swing doors (with center mullion) with another sent of swing doors (without a center mullion). The contractor will also be replacing two single automatic door openers with 2 double automatic door openers. Materials to Purchase The following is a list of material the contractor will need to provide for this work. It is not a complete list of materials but covers most of the larger items needed: o 2 LCN 9550 Series openers o Regular Arms o 710 finish o Width to be determined by contractor. o 2 Von Duprin 9947 o Quiet Electric Latch Retraction (QEL) o Night Latch (NL) o Cylinder Dogging (CD) o Less Bottom Rod (LBR) o Dummy Trim (DT) o 710 Finish o 2 Aluminum store front doors (if current doors cannot be reused) o Concealed vertical rod prepared. o 710 finish o Mid-rail for support o 2 EPT-10 (if current ones cannot be re-used) Contractor Responsibilities The following is a list of tasks the contractor is responsible to complete. o Remove the current closers (return units to the county at 1590 Highway 55, Hastings MN) o Remove the current Von Duprin crash bars (return units to the county at 1590 Highway 55, Hastings MN) o Remove and dispose of the current doors if the current doors cannot be re-used. o Provide the project manager a plan for the new door design. o Disconnect (do not damage) existing low voltage wire and card access equipment on the doors and store onsite for future use. o Install the purchased LCN 9550 openers o Install the purchased aluminum store front doors (if current doors are not being re-used) o Install the EPT-10s into the new doors (if current ones are not being re-used) o Wire the new LCN door openers. An electrical subcontractor may be hired if contracted company is unable to. o Gather all necessary construction permits o Meet ADA requirements for swinging entrance doors. o Meet all NFPA standards for swinging entrance doors. o Keep the existing visual aesthetic. o Provide a point of contract for scheduling construction dates and times. o Dakota County will be using other contractors for parts of this project. o Minimize disruption of the park building which will remain open during the work. o Coordination with the project manager and the park will be needed. o Weekend/Overnight/Holiday/Early Morning works is allowed and encouraged. o Ensure all electrical work for the new doors is up to code. o Repair, replace, or otherwise correct deficient materials and workmanship without additional cost to the owner. o Follow all county guidelines for contractors. Dakota County Staff Responsibilities The following is a list of tasks the county is responsible to complete for the contractor. o Provide the contractor access to the site o Hire a low voltage contractor to re-connect/re-install the removed card access equipment. o Have the county locksmith prepare and install the cores for the doors
Award
Playgrounds / Parks / Athletic Fields
$31,170.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2025
April 1, 2025
842 Cliff Rd, Eagan, MN
Related To This Project
Eagan, MN
Bid Date: Apr 04 2025
Eagan, MN
--
Eagan, MN
--
Eagan, MN
Bid Date: May 05 2025
Eagan, MN
Bid Date: Nov 18 2025
Eagan, MN
Bid Date: May 27 2025
Eagan, MN
--
Eagan, MN
--
Eagan, MN
Bid Date: Mar 19 2025
Eagan, MN
Bid Date: Mar 13 2025
Eagan, MN
Bid Date: Mar 13 2025
Eagan, MN
--
Eagan, MN
Bid Date: Mar 10 2025
Eagan, MN
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.