BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Site work for a road / highway in Cologne, Minnesota. Completed plans call for site work for a road / highway.

All labour and materials and all else necessary for 2025 Application of Waterborne Pavement Markings. Major Items Include (approximate quantities listed): CP 258982 4" SOLID LINE PAINT 223,475 LIN FT 4" DBLE SOLID LINE PAINT 139,337 LIN FT 6" SOLID LINE PAINT 808,917 LIN FT 4" BROKEN LINE PAINT 62,427 LIN FT 4" DOUBLE SOLID LINE PAINT 223,475 LIN FT PAVEMENT MARKING REMOVAL 11,455 SQ FT. The subject line of the document submittal shall state "Required Submittals for Highway 11/14 Intersection Improvements. Instructions on submitting a bid electronically can be found in the Carver County Guide to Bidding on the County website listed above. Prospective Bidders: Prior to submitting a bid, bidders are required to purchase bid credits from online. Each bid shall be accompanied by a bidder's bond naming Carver County as oblige, certified check payable to the Carver County Treasurer or a cash deposit equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the County in the event that the bidder fails to enter into a contract. The County reserves the right to retain the deposits of the three lowest bidders for a period not to exceed sixty (60) days after the date and time set of the opening of bids. No bids may be withdrawn for a period of sixty (60) days after the date and time set of the opening of bids. The Carver County Board of Commissioners reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the contract in the best interests of the County. Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. SCOPE OF WORK MODIFIED S-12.1 Delete and replace MnDOT 1402.3 with the following: 1402.3 Significant Changes to the Character of Work The Engineer reserves the right to make, in writing, at any time during the progress of the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes and alterations shall not invalidate the contract nor release the Surety, and the Contractor agrees to perform the work as altered.

Award

Roads / Highways

$161,795.00

Public - County

Site Work

11

7

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
122
Bidding Soon
1,532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

Multiple Locations, Cologne, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.