BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Demolition, site work, renovation and addition to a civil project in Hurricane, Utah. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project consists of process mechanical improvements at the existing Flow Control Building, Dissolved Air Flotation (DAF) Building, Filter Building, and Reclaim Pump Station. New piping, valves, actuators, and flow meters will be installed at the Flow Control Building to reduce headloss at increased plant flows. The existing DAF will be rerated from 40 mgd to 60 mgd and new recycle pumps, compressors, piping, and valves will be installed to accommodate increased DAF recycle flows. New filter inlet and waste backwash outlet valves and actuators will be installed at the Filter Building to replace existing aging valves. New pumps, piping, and valves will be installed at the Reclaim Pump Station to convey recycle water at increased plant flows. The project is located at the Quail Creek Water Treatment Plant at 270 N 5300 W, Hurricane, UT (approximately 10 miles northwest of St. George, Utah).

Award

Water / Sewer

$5,484,180.00

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

October 1, 2025

Project location map

270 N 5300 W, Hurricane, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.