Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Renovation of a data center facility in Grand Forks, North Dakota. Completed plans call for the renovation of a data center facility.
The University of Dakota and its associated NDUS data center is intending to upgrade the mechanical and electrical infrastructure to better accommodate an increase in server capacity on the raised floor. This work includes additional chiller modules to increase chilled water capacity for the facility. The associated dry coolers added under this contract will also be required to handle the additional heat rejection requirements. The initial chillers were installed 10 years ago and therefore requiring some modification to the existing chilled water piping to accommodate the new chiller modules. New CRAH computer room air handlers will be added to the raised floor. Existing piping and isolation valves are already in place to facilitate the connection of these new CRAH units. The electrical scope associated with the successful mechanical contractors work shall include the breakers, conduits, and conductors to facilitate providing power to the new chillers, dry coolers, and CRAH units. Bids shall include the scope of work associated with mechanical alternates M-1 and M-2 that increase the size of the chiller modules and also require the replacement of the two condenser water pumps to increase their capacity. Excavation and concrete work associated with the modification for the dry cleaner bases shall also be included under the mechanical's prime contract. It should be noted that this work is being performed in an existing live data center. The data center manager must be notified of all construction meetings leading to scheduling and implementation of the mechanical and electrical work. No work shall be performed leading to an interruption of power or cooling to the facility without requiring adequate advanced notice to the data center manager of the potential interruption. A spec section has been included that outlines the scope of commission and the required number of commissioning mechanical and electrical hours to be included in the base bid. Question Submission Close Date 3/20/2025 3:00 PM CDT
Bid Results
Data Centers
$2,314,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2025
April 28, 2025
3791 Campus Rd, Grand Forks, ND
Related To This Project
Grand Forks, ND
Bid Date: Mar 12 2025
Grand Forks, ND
--
2025 Concrete Street Repairs , Subdivision Concrete Rehab , Arterial Street Concrete Rehab - 5729286
Grand Forks, ND
Bid Date: Apr 10 2025
Grand Forks, ND
Bid Date: Apr 10 2025
Grand Forks, ND
Bid Date: Apr 10 2025
Grand Forks, ND
Bid Date: Apr 10 2025
Grand Forks, ND
--
Grand Forks, ND
Bid Date: Oct 23 2025
Grand Forks, ND
--
Grand Forks, ND
Bid Date: Mar 25 2025
Grand Forks, ND
Bid Date: Mar 21 2025
Grand Forks, ND
Bid Date: Mar 20 2025
Grand Forks, ND
Bid Date: Mar 13 2025
Grand Forks, ND
Bid Date: Mar 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.