BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work for a civil project in Seattle, Washington. Completed plans call for site work for a road / highway.

ROJECT DESCRIPTION: Work under this contract entails the replacement of wood pole assets that are at the end of serviceable life. These poles are rated as P1 and P2 meaning they have a potential of imminent failure. Associated primary conductors and pole equipment such as transformers, switches, services and other appurtenances will be transferred or replaced as part of the replacement work. Issued Work Packages may include but are not limited to the following work tasks: o Site preparation: o Installation and maintenance of temporary erosion and sedimentation controls, temporary services and safety measures including but not limited to barricades, fencing, and plating of excavations. o Installation of all tree and landscaping protection measures. o Site demolition, removal, and legal disposal: o Vegetation and waste soil o Demolition of existing wood pole assets and associated equipment: o Wood poles o Pole foundations o Down-guys and anchors o Wood or fiberglass cross-arms o Overhead transformers, cut-outs, switches, and other protective devices o Electrical conduits for underground terminations and service drops, wiring, and conductors o Secondary services o Steel trusses or other bracing equipment o Electrical vaults o Handholes o Installation of Owner furnished new wood pole assets and associated equipment: o Wood poles o Fiberglass poles o Pole foundations o Down-guys and anchors o Wood or fiberglass cross-arms o Overhead transformers, switches, and other protective devices o Electrical conduits for underground terminations and service drops, wiring, conductors, and neutrals o Secondary services o Electrical vaults o Handholes o Transfers of existing overhead equipment: o Primary conductors o Neutrals o Secondary services o Overhead transformers, cut-outs, switches, and other protective devices o Street light fixtures including bracket arms o AMR, AMI, and radio equipment o Transfers of third party communications facilities o Performing site restoration associated with wood pole installation: o Pavement and sidewalk restoration o Landscaping as needed o Removal of debris This description of work tasks is a summary and may not include all incidental work elements required to complete each Work Package. CONTRACT VALUE: The Contract amount is Not to Exceed $4,000,000. PROJECT LOCATION: Project locations will vary throughout the City Light Service Territory located as specified in each Work Package issued after the Contract is executed. Question Deadline 03/20/2025 at 5:00 PM PT Written questions must be submitted via email to mark.fredrick@seattle.gov

Award

Roads / Highways

$4,414,000.00

Public - City

Site Work

3

20

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
115
Bidding Soon
1,772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.