EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Seattle, Washington. Completed plans call for site work for a road / highway.

ROJECT DESCRIPTION: Work under this contract entails the replacement of wood pole assets that are at the end of serviceable life. These poles are rated as P1 and P2 meaning they have a potential of imminent failure. Associated primary conductors and pole equipment such as transformers, switches, services and other appurtenances will be transferred or replaced as part of the replacement work. Issued Work Packages may include but are not limited to the following work tasks: o Site preparation: o Installation and maintenance of temporary erosion and sedimentation controls, temporary services and safety measures including but not limited to barricades, fencing, and plating of excavations. o Installation of all tree and landscaping protection measures. o Site demolition, removal, and legal disposal: o Vegetation and waste soil o Demolition of existing wood pole assets and associated equipment: o Wood poles o Pole foundations o Down-guys and anchors o Wood or fiberglass cross-arms o Overhead transformers, cut-outs, switches, and other protective devices o Electrical conduits for underground terminations and service drops, wiring, and conductors o Secondary services o Steel trusses or other bracing equipment o Electrical vaults o Handholes o Installation of Owner furnished new wood pole assets and associated equipment: o Wood poles o Fiberglass poles o Pole foundations o Down-guys and anchors o Wood or fiberglass cross-arms o Overhead transformers, switches, and other protective devices o Electrical conduits for underground terminations and service drops, wiring, conductors, and neutrals o Secondary services o Electrical vaults o Handholes o Transfers of existing overhead equipment: o Primary conductors o Neutrals o Secondary services o Overhead transformers, cut-outs, switches, and other protective devices o Street light fixtures including bracket arms o AMR, AMI, and radio equipment o Transfers of third party communications facilities o Performing site restoration associated with wood pole installation: o Pavement and sidewalk restoration o Landscaping as needed o Removal of debris This description of work tasks is a summary and may not include all incidental work elements required to complete each Work Package. CONTRACT VALUE: The Contract amount is Not to Exceed $4,000,000. PROJECT LOCATION: Project locations will vary throughout the City Light Service Territory located as specified in each Work Package issued after the Contract is executed. Question Deadline 03/20/2025 at 5:00 PM PT Written questions must be submitted via email to mark.fredrick@seattle.gov

Award

Roads / Highways

$4,414,000.00

Public - City

Site Work

3

20

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Trenching, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
48
Bidding Soon
1,069
All Active Projects
463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pole Replacement Work Package Unit Price (WPUP) Contract #1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.