Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2025 at 8:00 PM
Updated April 11, 2025
Site work and paving for a road / highway in Moscow, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.
County: Latah Est. Value Notes: $2,500,000 to $5,000,000 Pavement Resurface and Rehabilitation Description: For the work of milling and inlaying approximately 0.2' of pavement on US-95 in Moscow Idaho Please use the project's Q&A feature for any design-related questions IDOT: Call 1 - US-95, Moscow Pavement Repairs *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. S912-05ASP HMA Deep Repair requires that this work be completed prior to milling. The typical sections state the patch is to match the top of the cold mill elevation. Similarly SP912-05B SP Pothole Patching states to place HMA +0.03' high to 0.00' low relative to the existing surface while the typical section states the patch is to match the top of cold mill elevations. If the intent is to cold mill the entire roadway prior to the these two items being completed then the required quantity of HMA for patching is one quantity, however, if this work is to be completed  prior to milling the entire roadway and if the patches are to be brought up to the existing roadway elevation, then a substantially higher quantity of HMA would be required forthese two items ofwork. Please clarify the timing (ie, before or after cold milling) of these two items as well as the required elevation of the patching HMA. The intent is to do all of the deep patch repairs (S912-05A) prior to milling and the potholing (S912-05B) after milling per the PHASING note in the Special Provisions. HMA is incidental to each pay item per the description in each pay item in the Special Provisions. In the coordination of contract documents. Special Provisions preside over Plan Details and Plan Sheets. The Department understands that extra costs would be required to pave the deep patch repairs to the pavement surface prior milling, which will remove some of the new pavement.
Award
Roads / Highways
$2,991,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
May 12, 2025
US-95, Moscow, ID
Related To This Project
Moscow, ID
Bid Date: Aug 26 2025
Moscow, ID
Bid Date: Apr 15 2025
Moscow, ID
Bid Date: May 13 2025
Moscow, ID
Bid Date: Dec 16 2025
Moscow, ID
Bid Date: Jun 09 2025
Moscow, ID
Bid Date: Jun 24 2025
Moscow, ID
Bid Date: Mar 05 2025
Moscow, ID
Bid Date: Mar 04 2025
Moscow, ID
Bid Date: Feb 25 2025
Moscow, ID
Bid Date: Feb 25 2025
Moscow, ID
Bid Date: Feb 11 2025
Moscow, ID
Bid Date: Feb 11 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
