BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Renovation of a municipal facility in Toronto, Ontario. Completed plans call for the renovation of a municipal facility.

EllisDon is the Construction Manager for the Toronto Waterfront Revitalization Corporation (TWRC) Port Lands Flood Protection and Enabling Infrastructure Project (PLFPEI). EllisDon invites eligible companies, firms or joint ventures to submit proposals for Hollow Metal doors and frames for the project, located in the City of Toronto. This work includes, but is not limited to, the following: This subcontractor to adhere to all requirements in applicable specification sections: 09 30 13 – Tiling (full extent of spec requirements to be included, for kitchen/kitchenette wall tile locations only, separate pricing to be provided for all washroom locations) 09 65 16 – Resilient Flooring (full extent of spec requirements to be included) 09 30 13.10 – Heritage Granite Pavers (full extent of spec requirements to be included) This subcontractor to provide for all resilient flooring needs in accordance with the above noted specification, architectural plans, floor finishes plans, room elevations, and room finish schedule in the design documents provided. This subcontractor to review finished substrates, and provide for any need to grind down minor irregularities in the finished slab (Concrete subcontractor will finish slab as per CSA A23.1 Type B) prior to flooring installation. Any means necessary to prepare the substrate for resilient flooring needs of this scope to be included in the pricing (including but not limited to moisture testing, adhesion testing etc to ensure for proper installation). This subcontractor to provide adequate ventilation equipment to cure product as per manufacturer's instructions. This subcontractor is to ensure all joints are smooth/tight between different flooring substrates, as well as for floor base installation throughout each room. This subcontractor to provide for waterproofing as per Detail 11/A801 underneath the Granite Tile underbed, to be terminated and tied in at base of glazed aluminum curtain wall frames adjacent. This subcontractor to provide temporary protection of all completed installs – resilient flooring, tiling, and granite pavers - to reduce risk of damage after this subcontractor has demobilized. Interested parties shall submit their interest to the following address in order to receive the RFP documentation. Email to: Monika Fabian (mfabian@ellisdon.com) Subject: RFP 71.9 - FH30 - Flooring - "name of your company". EllisDon reserves the right to cancel, waive or combine with alternate packages all or part of the scope, or to re-advertise this solicitation with either an identical or revised scope at any time. * The project value listed reflects the package estimate.

Post-Bid

Municipal

$100,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
5
Bidding Soon
2,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

April 14, 2025

Project location map

Multiple Locations, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.