Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Site work for a water / sewer project in Mantua, Utah. Completed plans call for site work for a water / sewer project.
**As of June 10, 2025, the project was awarded to Spindler Construction , with an awarded amount of $1,225,878.** 450,000 Gallon Pre-stressed Cast-in-place Culinary Water Concrete Storage Tank The Scope of Work Includes: Earthwork, Pipework, and Cast-in-place Concrete Tank Structure. 1. Scanned or Digital Copies of Following Documents Are Required for Electronic Bid Submittal: A. Bid Form Completed by Bidder. B. Bid Schedule Prices Fully Filled in by Bidder. C. A Scanned or Photocopy of an Executed Bid Bond Specific for the Project From Bidder's Bond Company; or, D. A Scanned Copy of a Certified Cashier's Check for 5% of Bidders Total Bid Price. the Cashier's Check 1.3 Bid Security A. Bid Security in the Amount of 5% Percent of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. Bid Security May Be in the Form a Bid Bond or Cashier's Check and Will Be Returned to Each Unsuccessful Bidder After Tabulation and Award of the Construction Contracts. 1.5 Basis of Bids A. Bids for Each Construction Contract Shall Be on a Unit Price Basis Per Each Bid Item, Unless an Item is Listed as a Lump Sump Basis. 1.6 Contract Time A. The Work Will Be Substantially Completed for the Construction Contract by September 30, 2025 Unless Justifiably Extended by Change Order. 1.8 Right to Reject Bids The Owner Reserves the Right to Reject Any or All Bids or to Waive Any Informality or Technicality in Any Bid if Deemed to Be in the Best Interest of the Owner. 1.9 Validity Period for Bids A. Bids Shall Remain Valid for 60 Days After the Day of Bid Opening. Bidders Who Withdraw Their Bid After Bid Opening, but Before Expiration of Said Period, Shall Forfeit Their Bid Security if Notice of Intent to Award to the Successful Bidder is Made by Owner. Bidders must have returned a prerequisite Bidder Registration form in order for the bid to be considered by the Owner. Any bids received from Contractors who did not previously submit a Bidder Registration form will not be accepted.
Award
Water / Sewer
$1,225,877.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
