BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in Mantua, Utah. Completed plans call for site work for a water / sewer project.

**As of June 10, 2025, the project was awarded to Spindler Construction , with an awarded amount of $1,225,878.** 450,000 Gallon Pre-stressed Cast-in-place Culinary Water Concrete Storage Tank The Scope of Work Includes: Earthwork, Pipework, and Cast-in-place Concrete Tank Structure. 1. Scanned or Digital Copies of Following Documents Are Required for Electronic Bid Submittal: A. Bid Form Completed by Bidder. B. Bid Schedule Prices Fully Filled in by Bidder. C. A Scanned or Photocopy of an Executed Bid Bond Specific for the Project From Bidder's Bond Company; or, D. A Scanned Copy of a Certified Cashier's Check for 5% of Bidders Total Bid Price. the Cashier's Check 1.3 Bid Security A. Bid Security in the Amount of 5% Percent of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. Bid Security May Be in the Form a Bid Bond or Cashier's Check and Will Be Returned to Each Unsuccessful Bidder After Tabulation and Award of the Construction Contracts. 1.5 Basis of Bids A. Bids for Each Construction Contract Shall Be on a Unit Price Basis Per Each Bid Item, Unless an Item is Listed as a Lump Sump Basis. 1.6 Contract Time A. The Work Will Be Substantially Completed for the Construction Contract by September 30, 2025 Unless Justifiably Extended by Change Order. 1.8 Right to Reject Bids The Owner Reserves the Right to Reject Any or All Bids or to Waive Any Informality or Technicality in Any Bid if Deemed to Be in the Best Interest of the Owner. 1.9 Validity Period for Bids A. Bids Shall Remain Valid for 60 Days After the Day of Bid Opening. Bidders Who Withdraw Their Bid After Bid Opening, but Before Expiration of Said Period, Shall Forfeit Their Bid Security if Notice of Intent to Award to the Successful Bidder is Made by Owner. Bidders must have returned a prerequisite Bidder Registration form in order for the bid to be considered by the Owner. Any bids received from Contractors who did not previously submit a Bidder Registration form will not be accepted.

Award

Water / Sewer

$1,225,877.00

Public - City

Site Work

19

19

12

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
67
Bidding Soon
847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 16, 2025

Project location map

Multiple Locations, Mantua, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.