Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Demolition, site work and asbestos abatement for a residential development in Dearborn, Michigan. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Reference Number 0000379019 Question Acceptance Deadline 03/11/2025 03:00 PM EDT Questions are submitted online No Bids are being solicited for Abatement, Demolition, and Site Restoration for 5021 Wyoming, and 5063 Wyoming, Dearborn, MI 48126. 5021 Wyoming, and 5063 Wyoming - Commercial Properties. All Invoices must be submitted to the City on or before April 16, 2025. All adjacent buildings, structures or property and all public property are to be adequately protected against damage from any cause. When necessary, this may include bracing, shoring, fencing, underpinning if necessary, or other protection. Asbestos survey and "Notification of Intent to Renovate/Demolish" (MDLEG/MDEQ notification) must be submitted with demolition permit application. Secure site with proper barricades and fence. A minimum 6 ft. barricade fence must be used as a barricade. All work zones must be clearly marked with warning signs and barricades (fences) for the public. The Contractor shall be responsible for furnishing and placing all construction signs, barricades, pavement markings, lights, etc., required within the work area. During the course of work, provisions must be made to maintain access for emergency vehicles at all times. All signs and barricades shall conform to the 1994 Michigan Manual of Uniform Traffic Control Devices and the 2003 Michigan Department of Transportation Standard Specifications for Construction. Vehicular and pedestrian traffic (on sidewalks) must not be impeded. Remove all asbestos per Federal and State guidelines and obtain necessary asbestos clearances. If required, sign a Detroit Edison indemnification agreement to use the "hand wreck method." The complete removal of all walls, roofing, posts, masonry and any other above grade structures are to be completely removed from the demolition site, unless specifically permitted otherwise in writing as part of the demolition permit. All signage & support, and wiring is to be completely removed. CONCRETE: Contractor is to remove all at-grade or below grade concrete including: (1) Floors (2) Footings (3) Foundations (4) Concrete work ii) Contractor IS NOT to install new concrete curb and gutter along Wyoming. iii) Contractor is responsible for all damages to existing sidewalk, curb and gutter, etc. (1) Remove and replace sidewalk that may be damaged during construction. Sidewalk shall have a minimum depth of 4". (2) Use 3500 PSI concrete mix for concrete pavement, curb & gutter and sidewalk. iv) Leave sidewalk and approach along Wyoming. v) Leave sidewalk along Marvin Street. vi) Remove approach along Marvin Street. vii) Install curb and gutter along Marvin Street. viii) Leave alley approach along Marvin Street. j) SEWER: Cap sewer opening at property line. Remove and cap all storm sewers located on 5021 Wyoming and 5063 Wyoming properties. k) Removal and disposal of demolished and/or disassembled materials. This includes all debris on the site even though it is not part of the structures or their contents. l) Contractor shall not remove existing soil unless otherwise directed. m) Complete restoration or replacement of damaged private and public property. n) Backfill the area and all areas below grade. Before backfilling, ensure that areas to be filled are free of standing water, materials, organic matter, trash and debris. o) Backfill must obtain 95% compaction on deep footing holes with clean fill with a minimum of 4" of topsoil. p) On any areas that are left with bare ground: reseed with 5lbs per 1,000 sq. ft. with a mix of 48% Rye, 30% Greenburg Red and 22% Kentucky Blue Grass - hand thrown and protected with straw covering q) Remove all fencing, barriers, and/or bollards.

Bid Results

Residential Subdivision

$37,749.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
179
Bidding Soon
2,664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

April 11, 2025

Project location map

Multiple Locations, Dearborn, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.