Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 27, 2025
This is a service / maintenance or supply contract in Kansas City, Kansas. Contact the soliciting agency for additional information.
Questions Due: 3/19/2025 Proposers may request additional information in writing about the project. All questions must be submitted to Department of Purchasing & Supply Chain (jbagby@bpu.com and purchasing@bpu.com). This Request for Proposal (RFP) is for Horizontal Collector Well No. 2 Pump No. 5 Pull, Inspection and Rehab. The Kansas City Board of Public Utilities (BPU) is seeking proposals from interested proposers for the pulling of a vertical turbine pump for cleaning, sandblasting and a full inspection at Horizontal Collector Well No. 2 (HCW2) at BPU Nearman Water Treatment Plant (NWTP). Per the attached specification, proposer shall provide all equipment and services to pull the existing pump and transport if necessary for a full inspection. The proposer shall also provide all equipment and services for rehabbing or replacing any pump components identified in the inspection as needing rehabilitation or replacement. Lastly the proposer shall provide all equipment and services for reinstalling the pump at the HCW2. BPU shall be responsible for unwiring the existing pump motor prior the proposer pulling the pump, the lifting of the motor will be the responsibility of the proposer. BPU shall be responsible for the rewiring of the existing pump motor after the proposer has set the motor after the reinstallation of the pump. A full inspection report will need to be provided by the proposer to BPU after the pump has been inspected and the components requiring rehab or replacement have been identified, the report shall include the lead times for any components requiring replacement and the time needed to rehab existing components as well as the breakdown of the cost for all services. SC-1 PROJECT TIMELINE Mobilization for pump pull 30 Days from Contract Execution Pump pull and inspection report 90 Days from Contract Execution Project Completion December 1, 2025 Project Billing Completed 30 days after invoice
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025
Multiple Locations, Kansas City, KS
Related To This Project
Kansas City, KS
Bid Date: Apr 03 2025
Kansas City, KS
Bid Date: Apr 24 2025
Kansas City, KS
Bid Date: Mar 21 2025
Kansas City, KS
Bid Date: Apr 02 2025
Kansas City, KS
Bid Date: Apr 01 2025
Kansas City, KS
--
Kansas City, KS
Bid Date: Apr 16 2025
Kansas City, KS
Bid Date: Apr 30 2025
Kansas City, KS
Bid Date: Mar 19 2025
Kansas City, KS
Bid Date: Apr 03 2025
Kansas City, KS
Bid Date: Mar 12 2025
Kansas City, KS
--
Kansas City, KS
Bid Date: Mar 13 2025
Kansas City, KS
Bid Date: Mar 17 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
