BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 27, 2025

This is a service / maintenance or supply contract in Kansas City, Kansas. Contact the soliciting agency for additional information.

Questions Due: 3/19/2025 Proposers may request additional information in writing about the project. All questions must be submitted to Department of Purchasing & Supply Chain (jbagby@bpu.com and purchasing@bpu.com). This Request for Proposal (RFP) is for Horizontal Collector Well No. 2 Pump No. 5 Pull, Inspection and Rehab. The Kansas City Board of Public Utilities (BPU) is seeking proposals from interested proposers for the pulling of a vertical turbine pump for cleaning, sandblasting and a full inspection at Horizontal Collector Well No. 2 (HCW2) at BPU Nearman Water Treatment Plant (NWTP). Per the attached specification, proposer shall provide all equipment and services to pull the existing pump and transport if necessary for a full inspection. The proposer shall also provide all equipment and services for rehabbing or replacing any pump components identified in the inspection as needing rehabilitation or replacement. Lastly the proposer shall provide all equipment and services for reinstalling the pump at the HCW2. BPU shall be responsible for unwiring the existing pump motor prior the proposer pulling the pump, the lifting of the motor will be the responsibility of the proposer. BPU shall be responsible for the rewiring of the existing pump motor after the proposer has set the motor after the reinstallation of the pump. A full inspection report will need to be provided by the proposer to BPU after the pump has been inspected and the components requiring rehab or replacement have been identified, the report shall include the lead times for any components requiring replacement and the time needed to rehab existing components as well as the breakdown of the cost for all services. SC-1 PROJECT TIMELINE Mobilization for pump pull 30 Days from Contract Execution Pump pull and inspection report 90 Days from Contract Execution Project Completion December 1, 2025 Project Billing Completed 30 days after invoice

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
90
Bidding Soon
1,166
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

April 25, 2025

Project location map

Multiple Locations, Kansas City, KS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.