BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Site work and new construction of a fire / police facility in Plymouth Meeting, Pennsylvania. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The time for asking questions will be extended to 12:00 pm (noon) on Monday April 14th. Each bid must be accompanied by a certified check or bid bond payable to the order of PLYMOUTH TOWNSHIP executed by the bidder and acceptable surety, in an amount equal to ten (10%) percent of the base bid amount. Estimated Contract Value: $4 million total for all contracts combined Online Portal PLYMOUTH TOWNSHIP hereby reserves the right to reject any or all bids submitted, or any portion thereof, and also reserves the right to waive any informalities or irregularities in bids received, when, within the sole discretions of the Township, such rejection or waiver is in the best interests of the Township. A New Fire Station for Harmonville Fire Company - Plymouth Valley Station. Project Location: 904 Germantown Pike, Plymouth Meeting, PA 19462. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. The project consists of demolition of the existing fire house (adjacent to the Ambulance Corp building) and construction of a new two-story structure. The new structure is approximately 8,800 square feet of floor space and is classified as a Risk Category IV - Essential Facility. The building is Construction Type VB and will be fully sprinklered. The structure will be slab on grade with a structural steel frame, and steel stud walls. Work is to include all related site work, including demolition of various site elements and relocation/construction of new basketball courts that need to be relocated for the new entrance drive that wraps around the rear of the building. The current and new building will share a wall with the Plymouth Community Ambulance building, and as such, some work will involve coordination with Plymouth Community Ambulance, who are to remain in full operation for the duration of the project. It will also involve structural reinforcement of one bar joist in the Plymouth Ambulance Community building. And includes all other Work indicated in the Contract Documents. Question Deadline 04/14/2025 at 12:00 PM ET Bid Result ELECTRICAL Le Blue Goose-$ 747,831 MECHANICAL Le Blue Goose-$ 560,738 GENERAL E.R.Stubner-$ 3,261,000 PLUMBING Le blue Goose-$ 359,293

Bid Results

Fire / Police

$4,928,862.00

Public - City

New Construction, Site Work

175

70

70

8

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
947
Active Projects
399
Bidding Soon
5,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 8, 2025

Project location map

904 Germantown Pike, Plymouth Meeting, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.