BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a mixed-use development in Maple Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 21, 2025, the project was awarded to New Look Contracting, LLC, with an awarded amount of $2,983,860.05.** Site Directions: Eastman Nature Center, Summer Recreation Area, Winter Recreation Area, Bottineau House, Operations Center, County Road 121 trailhead and the roads leading to these facilities. Two new parking lots will be constructed adjacent to the Winter Recreation Area and at Eastman Nature Center. The trailhead will be removed along Elm Creek Road and will be combined with the new parking expansion at Eastman Nature Center. Project Category Code: Parks, Recreation, Trail Work, Paving - Concrete, Pavement - Marking, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Tree Cutting, Landscaping Tree, Shrub Planting, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Concrete/Shotcrete/Sprayed, Asphalt Pulverizing, Pavement Removal, Erosion Control - Temporary, Paving (Asphalt or Concrete), Cement Subgrade, Miscellaneous, Parking Lots/Ramps, Storm Drain and Paving, Trails and/or Multipurpose Trails, Asphalt Overlay, Rehab. and/or Maint., Sitework/Excavating and Grading, Concrete Resurfacing Services, Paving (Trail Paving), Grubbing & Clearing, Pavement Preservation, Concrete Crushing, Cutting/Recycling (Concrete or Asphalt), Pavers/Permeable Pavers, Landscaping (Tree Trimming/Cutting), Landscaping (Tree and Shrub Clearing), Aggregate, Bituminous Patching/Coating/Surfacing, Concrete/Formed/Flatwork/Foundation, Remove Contaminated Soil, Concrete Walkway, Concrete Pavement, Wetland Mitigation, Grade, Surface and Bridge, Grade and Surface, Pavement Resurface and Rehabilitation, Curbs, Paving (Parking Lot Paving), Concrete Pavement Removal, Concrete Repair. Description: Furnishing all labor, materials, equipment, and skill required for work as described in the Bidding Documents. Additional Description: The project generally includes but is not limited to mill and overlay of the existing parking lots and roads, concrete pavement accessibility improvements to the existing parking stalls and access routes to the facilities and 2 new paved parking lots. Pre-Bid Meeting Info: A pre-bid meeting will not be held.

Award

Sidewalks / Parking Lot

$2,983,860.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
127
Bidding Soon
1,561
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 25, 2025

Project location map

Multiple Locations, Maple Grove, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.