BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a mixed-use development in Maple Grove, Minnesota. Completed plans call for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

In general, the work consists of the following approximate quantities: 1440 SY Elm Creek School Tennis/Pickleball Hybrid Court Reconstruction 445 SY Elm Creek School Basketball Court Reconstruction 1380 SY Teal Lake Park Tennis Court Reconstruction 445 SY Teal Lake Park Basketball Court Reconstruction 455 LF Galvanized Fence Fabric 4 EA Basketball Standard 260 LF Concrete Maintenance Strip Along with traffic control, erosion control, landscape restoration, and related appurtenances. All plan holders who order electronic proposals through online will receive addenda as they are released; however, it is the Contractor's full responsibility to ensure they have received all addenda prior to the submittal of bids. PROJECT DESCRIPTION: Elm Creek Elementary School Park, 9830 Revere Ln N: Conversion of an existing tennis court to ahybrid tennis / pickleball court. Project consists of the removal of existing bituminous surface and the rebuilding of a new bituminous court surface. Striping of one hybrid tennis / pickleball courts; excluding posts, net and concrete maintenance strip. In addition, removal and rebuilding of one existing basketball court with the addition of a concrete maintenance strip. Replacement of basketball posts, hoops and backboards to be included as well. Teal Lake Park, 9600 Rosewood Ln N: Reconstruction of an existing tennis court which includes removal and rebuilding of a new bituminous court surface. Striping of two tennis courts including pickleball lines; existing posts, fence fabric and maintenance strip to be protected. Existing basketball court to be reconstructed by the removal and rebuilding a new bituminous surface. Project to include replacement of existing basketball posts, hoops and backboards, and exclude concrete maintenance strip.

Award

Playgrounds / Parks / Athletic Fields

$320,890.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
82
Bidding Soon
1,525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

Multiple Locations, Maple Grove, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.