EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Mattoon, Illinois. Completed plans call for site work for a water / sewer project.

The work includes removing and replacing some components, and other repairs and upgrades to interior components of the 70' diameter Clarifiers #3 and #4. The existing concrete structure is to remain. There are some manholes to remove and piping to be plugged. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and all Equal Employment Opportunity requirements. Certified payrolls are required weekly. The right is reserved to waive technicalities and to reject any or all proposals. The City of Mattoon is accepting proposals for work related to the (2) half bridge clarifiers at the Mattoon, IL WWTP at 820 South 5th Place, Mattoon, Illinois 61938. Contractor will supply parts, materials, and machinery to complete job and also state the warranty of the work completed. Section includes: 1. Rehabilitation of two 70'.00" diameter clarifiers including: a. Replacement of .5 HP motor b. Replacement of Nord 573.1-71L/4 CUS gear reducer c. Rebuild existing H30 LT Drive Unit d. Replacement of 14' 9" Influent Well A36 Carbon Steel e. Replacement of 24" Center Pier A36 Carbon Steel f. Replacement of 48" Truss Section A36 Carbon Steel g. Replacement of 4 Panel Cage Unit A36 Carbon Steel h. Replacement of Clarifier Suction Header HDG i. Replacement of Clarifier Manifold with seals j. Removal of (2) 4' Scum Beach, and plug off k. Replacement of (1) 4' Scum Beach W/ (1) 6' Scum Beach with Submerged Shelf HDG, and (1) Flushing Device 304 SS. l. Replacement of existing Scum Blade A36 Carbon Steel m. Replacement of (1) 4" Skimmer Assembly W/ (1) 6' Skimmer Assembly. 304 SS. n. Fasteners are to be stainless steel. o. Abrasive blasting and coating of the drive mechanism, and existing bridge unit. p. Remove, and reinstall bridge grating, kick plate, handrail following abrasive blasting and coating. 2. Structural steel to conform to ASTM A36. All welding to conform to American welding society standard AWS 01.1

Award

Water / Sewer

$600,000.00

Public - City

Site Work

12

5

2

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
35
Bidding Soon
412
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

April 11, 2025

img_map_placeholder

820 S 5th Pl, Mattoon, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

WWTP Secondary Clarifier Rehab

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.