Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2025 at 8:00 PM
Updated June 17, 2025
Site work and paving for a sidewalk / parking lot in McDonald, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The character and amount of security to be furnished by each bidder are stated in the above mentioned contract documents. Participating contractors must be able to provide Criminal Background Checks, FBI Fingerprinting, and Child Abuse Clearances for all employees working on or around the property. All applicable federal, state and local laws, rules and regulations apply. The Fort Cherry School District reserves the right to reject any or all bids, and/or to waive any informality, infirmity, omission, defect, irregularity and/or disqualifying error in any bid. High School - Demo and remove 10,180 square feet of sidewalks and patio slabs. Install sub base of 4-6" of compacted 2B limestone. 1/2 " rebar and 8 gauge wire mesh. 4500 PSI Concrete mix. Concrete thickness - 5" sidewalk slabs, entrances to buildings - 6". 1/2" wide by 5 - 6" fiber expansion material with cap. Slabs against building and around all columns will have fiber expansion material. - Replace 8 ADA Warning Pads 64 square feet. - Demo and remove 2 sets of steps. First set is 5 steps 4' wide per step with a 6' by 9' landing slab. Install railings. Second set is 8 steps, 8' wide per step with a 6' by 13' landing. Install railings. Remove and replace approximately 5' high block and brick side walls down to footing. Remove and replace 68' of concrete curb. 8" wide by 18" deep. Elementary School - Demo and remove 3,440 square feet of sidewalk slabs. Install sub base of 4-6" of compacted 2B limestone. 1/2 " rebar and 8 gauge wire mesh. 4500 PSI Concrete mix. Concrete thickness - 5" sidewalk slabs, entrances to buildings - 6". 1/2" wide by 5 - 6" fiber expansion material with cap. - Remove and replace 32' of concrete curb. 8" wide by 18" deep. Bidresult 1.HVAC Quackenbush Go, Inc.- 1,497,000.00 2.Electrical Frey Electric Construction Co.- 888,000.00
Award
Sidewalks / Parking Lot
$306,918.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
110 Fort Cherry Rd, McDonald, PA
Related To This Project
McDonald, PA
Bid Date: Jun 05 2025
McDonald, PA
Bid Date: Jun 02 2025
McDonald, PA
Bid Date: Jul 02 2025
McDonald, PA
Bid Date: Nov 06 2025
McDonald, PA
Bid Date: Dec 11 2025
McDonald, PA
Bid Date: Mar 18 2025
McDonald, PA
Bid Date: Feb 19 2025
McDonald, PA
Bid Date: Feb 18 2025
McDonald, PA
Bid Date: Mar 17 2025
McDonald, PA
Bid Date: Oct 09 2024
McDonald, PA
Bid Date: Jul 08 2024
McDonald, PA
Bid Date: Dec 16 2021
McDonald, PA
Bid Date: Jul 28 2022
McDonald, PA
Bid Date: Jun 15 2022
McDonald, PA
Bid Date: Apr 28 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
