Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2025 at 8:00 PM

Updated April 11, 2025

Renovation of an educational facility in Vancouver, British Columbia. Completed plans call for the renovation of a educational facility.

The University of British Columbia is seeking the services of qualified and experienced General Contractors Services for the Henry Angus Chiller Replacement Question Deadline Apr 3rd 2025, 4:00 PM PDT Documents can be obtained from https://ubc.bonfirehub.ca/ SCOPE OF WORK .1 This specification section is to be used in conjunction with all other contract documents. The commissioning process does not relieve contractors from the obligations to complete all portions of work in satisfactory and fully operational manner. .2 Furnish labor and material to accomplish and complete commissioning as specified herein. Complete interim commissioning of systems during initial season operation and follow-up with seasonal testing to complete commissioning and ensure correct operation. .3 System installation, start-up testing, calibration, functional tests, integrated tests, performance testing, preparation of O&M manuals, demonstration and training, deferred and seasonal testing is the responsibility of the CM, Division 20 through 28 contractors and equipment suppliers/vendors. .4 The commissioning plan shall include the following tasks and actions: .1 Documentation of the construction process. .2 Ensuring the basis of design as well as the design intent is carried out. .3 Completion and execution of a Commissioning Plan (see section 3.4). .4 Reporting and communicating the project schedule progress. .5 Installation review with QA/QC verification .1 Orientation and integrity checks. .2 Point to point testing. .3 Pressure and integrity testing. .4 Water fill and treatments. .5 Review of manufacturer’s recommendations. .6 Equipment start-up procedures: .1 Using the Cx schedule, coordinate equipment start-up. .2 Ensure multiple trades are aware of tasks being performed and their attendance requirement .7 Functional tests: .1 Coordinate trades, tasks and systems, so that dedicated time can be spent with minimal interference of conflicting tasks and trades. .2 Ensure all equipment is effectively communicating with systems. .8 Main Plant start-up: .1 Coordinate main plant start-up after manufacturer’s pre-requisites and associated equipment functional testing, QA/QC verified. .9 Integrated system tests: .1 Prepare and execute integration testing as per the Commissioning Plan. .10 Provide on-site demonstrations for the systems specified, with reference to the Demonstrations and Training section. .11 Seasonal and Deferred Testing. .12 Confirmation of Performance.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

8

16

31

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
116
Bidding Soon
2,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

2053 Main Mall, Vancouver, BC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed