Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 10, 2025 at 8:00 PM
Updated October 1, 2024
Demolition, site work, remodeling, renovation and addition to a fire / police facility in Prescott, Arizona. Conceptual plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the remodel of a fire / police facility; for site work for a fire / police facility; and for the renovation of a fire / police facility.
The proposed renovation for Fire Station 72 is the most critical of all stations due to its age and overall condition. In addition, the increasing number of incidents in the downtown area does not allow for efficient integration of low-acuity call response units due to lack of accommodations and space. This remodel is dependent on a successful property swap between the city and CAFMA. The remodel aims to modernize the facility to better serve the community's needs and accommodate firefighters safely. One of the immediate benefits is to be able to effectively house a new 105' platform aerial that will be delivered to the department in Summer. Currently, the apparatus bays are somewhat undersized to accommodate the new unit. In addition, the station is anticipated to be adapted further to meet the risks faced by the community in the downtown area by including specific features to accommodate related initiatives. Station 72 will be around 55 years old at the time of this remodel and has several limitations related to modern health and safety systems such as bunker gear storage, decontamination areas, and gender-neutral accommodations. The station is a converted mechanic shop that has limitations due to this design. This has created associated energy issues, and the station presents some of the biggest health and safety related challenges overall. This remodel is anticipated to improve energy efficiency so that it can capture a return on the investment relatively quickly. A review of Prescott fire stations was conducted in 2023 that combined a 2015 professional study and best practice analysis to rate each fire station. Fire Station 72 ranked 1 and scored a 39.10 rating. This project is in included in the City of Prescott's FY 2025-2029 Capital Improvement Plan (CIP). As of March 10, 2025, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Fire / Police
$9,070,000.00
Public - City
Addition, Demolition, Remodeling, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
1700 W Iron Springs Rd, Prescott, AZ
Related To This Project
Prescott, AZ
--
Prescott, AZ
Bid Date: Mar 27 2025
Prescott, AZ
--
Prescott, AZ
Bid Date: Apr 10 2025
Prescott, AZ
Bid Date: Apr 10 2025
Prescott, AZ
Bid Date: Mar 25 2025
Prescott, AZ
--
Prescott, AZ
Bid Date: Feb 27 2025
Prescott, AZ
Bid Date: Feb 27 2025
Prescott, AZ
Bid Date: Feb 27 2025
Prescott, AZ
Bid Date: Mar 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.