Renovation of an educational facility in Vienna, West Virginia. Completed plans call for the renovation of a educational facility.

Project Description: Work includes but is not limited to site improvement work around the entire campus including modifications to existing utilities and parking, new grading, paving, and sidewalk improvements, and other utility improvements as noted in the contract documents. Phase 4 work shall be carefully coordinated with other phases of work occurring concurrently on site. Project Estimated Schedule: Construction start date on or about April 14, 2025 and Final Completion on or before August 8, 2025. All questions shall be directed to Shelby Wagner of Pickering Associates at swagner@pickeringusa.com. 1. Addenda may be issued during the bidding period. All addenda become part of the Contract Documents. Include resultant cost in the Bid Amount. 2. Verbal answers are not binding on any party. 3. Clarifications requested by a Bidder must be submitted in writing to Shelby Wagner prior to 4:00 pm on March 28, 2025. The reply will be submitted in the form of an addendum, a copy of which will be forwarded to all Contractors who have downloaded Bid Documents from the Pickering Associates planroom. 4. It is the responsibility of the Bidding Contractor to make all their Subcontractors aware of such addendum. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. The successful Bidder will be required to provide Performance and Payment Bonds. The Owner reserves the right to accept or reject any or all offers to make selections from the bids that are solely in its own best interest. Question Deadline 03/28/2025 at 4:00 PM ET

Post-Bid

Educational

$800,000.00

Public - City

Renovation

27

9

6

2

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
52
Bidding Soon
553
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

April 14, 2025

img_map_placeholder

1 Campus View Dr, Vienna, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.