Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Renovation of a detention facility in Manistee, Michigan. Completed plans call for the renovation of a detention facility.
On behalf of the Michigan Department of Corrections (MDOC), the Department of Technology, Management, and Budget (DTMB) is requesting professional design services for the evaluation, design, bidding, and construction administration for the repair, replacement and upgrade the emergency power system and associated electrical infrastructure at the Oaks Correctional Facility. The existing emergency power system currently supports critical systems and facilities and requires expansion to support the whole Oaks Correctional Facility campus. This request is to provide a Phase 100 Study, Phase 300 Schematic Design, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection services. The original generator and switchgear are still in place and nearing the end of their useful life, they may be undersized to meet the facilities current needs. A phase 100 study is required to evaluate the existing medium voltage emergency power equipment including but not limited to the medium voltage switches, transformers, and primary switch gear and provide recommendations for repairs and upgrades to the system to meet current code requirements. Limited drawings are available, the PSC must field verify all conditions. We anticipate at least two phases of construction: Phase 1: The facility has an immediate need for additional emergency circuits to support: heating systems in housing units 1,2,6 &7 and cooling system for the administration building. Phase 2: Upgrade of emergency power system to support the entire Oaks Correctional Facility campus Additional Considerations: o Emergency power system shall be capable of operating uninterrupted for a minimum of 72 hours without re-fueling. Upgrades to the existing diesel fuel system may be required as a part of this work. o Provide transfer switch that will allow the facility to connect a portable generator in the event of a generator failure. o Provide additional emergency circuits to support the Administration building Warden's suite. o Emergency power equipment must be programmed to communicate with the facility's existing control center. o A new structure may be required to house generator and associated electrical equipment. o Existing emergency power system to remain operational throughout project. Full emergency power shall be available during equipment change- over. o Unable to trace existing utilities on-site, directional boring or hydro-excavation is required to avoid existing utilities. o Construction to be completed outside of winter/heating season. o MDOC Utility and Security Shut Down Standards and Special Working conditions apply. Please do not submit online questions via VSS. ALL questions should be emailed to Ronda Osga at osgar@michigan.gov address no later than 2:00 p.m., Eastern on April 16, 2025.
Bid Results
Jails / Prisons
$261,955.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2025
January 2, 2026
1500 Caberfae Hwy, Manistee, MI
Related To This Project
Manistee, MI
Bid Date: Apr 07 2025
Manistee, MI
Bid Date: May 22 2025
Manistee, MI
Bid Date: Jun 16 2025
Manistee, MI
Bid Date: May 23 2025
Manistee, MI
Bid Date: Jun 06 2025
Manistee, MI
Bid Date: Jul 22 2025
Manistee, MI
Bid Date: May 28 2025
Manistee, MI
Bid Date: Jun 20 2025
Manistee, MI
Bid Date: Mar 24 2025
Manistee, MI
--
Manistee, MI
Bid Date: Mar 18 2025
Manistee, MI
Bid Date: Feb 28 2025
Manistee, MI
--
Manistee, MI
Bid Date: Jan 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.