BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2025 at 8:00 PM

Updated March 13, 2025

This is a service / maintenance or supply contract in Woodbridge Township, New Jersey. Contact the soliciting agency for additional information.

The New Jersey Turnpike Authority's Capital Improvement Program is comprised of a variety of projects to improve operational safety, infrastructure maintenance and operational improvements for the motoring public as well as the overall health, safety and welfare of workers and the public who utilize the various facilities that are owned and operated by the Authority. The Authority is proposing operational improvements on the Parkway in the vicinity of Interchanges 80-83. This project will improve the Parkway geometry to meet current design standards, where feasible. The proposed improvements include continuous auxiliary lanes to reduce queuing delays and minimize substandard weaves as well as a collector-distributor road (service roads) to physically separate local ramp traffic from the Parkway mainline traffic. Interchange 80 will include adding new southbound entrance ramp to the Parkway and a new northbound exit ramp. Retaining walls are required, when deemed appropriate, to minimize impacts to adjacent properties and environmental resources. Other project improvements include replacement of guide rail, drainage system upgrades, overhead and cantilever sign structures and possible noise walls. Stormwater management was initiated during preliminary engineering to meet New Jersey Department of Environmental Protection and Pinelands regulations. The contract limits extend between Milepost 78.8 to Milepost 84.5. The project is within Toms River and Berkeley Townships and South Toms River and Beachwood Boroughs. Within the project limits the Parkway intersects the local roadway network at Interchanges (80, 81, 82/82A) which are closely spaced. It is the Authority's intent to improve safety and the operations of the Parkway Interchanges and ramps connecting to State and County roadways. The preliminary engineering design and initial environmental services for the project are complete. The conditional permit has been issued on February 27, 2025 by the NJDEP Watershed and Land Management. Question Deadline 03/18/2025 Inquiries pertaining to this RFEOI are to be directed in writing to Vincent Mignella, via e-mail mignella@njta.com with a copy to Dawn Margolis and email at margolis@njta.com. The subject line should read "OPS No. P3885, EOI Inquiry". Responses will be posted on the Authority's website under Doing Business/Current Solicitations on or before Thursday, March 20, 2025. Bid Date notes: One (1) PDF copy uploaded to the "EOI" folder in Kiteworks and in accordance with the following naming convention: "OPS No. P3885_EOI_ Firm Name"; and four (4) hard copies (one (1) original with cover clearly marked "Original" and three (3) copies) of the EOI shall be delivered to the Authority's Headquarters with the package clearly labeled with the Qualified Firm's name and the words, "EOI, OPS No. P3885", no later than the date and time referenced above. Late submissions will not be considered and will be returned unopened. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,000
Active Projects
543
Bidding Soon
7,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

Project location map

Multiple Locations, Woodbridge Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.