Renovation of a municipal facility in Raleigh, North Carolina. Completed plans call for the renovation of a 9,586-square-foot, two-story above grade municipal facility.

Questions or substitution requests should be directed to Tara Reed, at tara@esse-architects.com. Question Deadline 03/11/2025 at 5:00 PM ET All materials and methods of construction must conform to Kentucky Transportation Cabinet, Department of Highway's specifications will all subsequent revisions. o Quantities will be determined after review of City of Jeffersontown road system. All roads will be within the corporate city limits of Jeffersontown. o Scheduling of Resurfacing - Contractor shall make every effort to schedule work at least one week in advance. A copy of schedules shall be made available to Public Works Department no later than Thursday noon of the preceding week. o Wedging Materials and Shaping - Some roads designated for resurfacing will include low areas that require wedging prior to a compacted 1" overlay. Contractor costs to wedge shall be priced on a per ton basis. o Cleaning of existing Pavement and Gutters - Gutters that are to be resurfaced with asphalt material shall be thoroughly cleaned including joints, of all sand, slit, grass and other foreign matter. Application of appropriate herbicides may be required in some areas. Outside edges of existing payment and shoulders shall be cut back far enough to expose the existing edge and allow rollers to make full contact with new surface course. Cost of all cleaning and trimming shoulders shall be included in price of asphalt materials. Cleaning and surface preparation must be approved by Public Works department prior to road resurfacing. o Edge Keys - Edge Keys will be required in areas where new pavement adjoins non-resurfaced roads. o R/R (Base Failure Reconstruction) - Include excavation and all materials required to repair substructure shall be done prior to the placement of the final course. 1. 6-4-2: 6" Base Rock - 4" Asphalt Base - 2" Asphalt Surface 2. 10-4-2: 10" Base Rock - 4" Asphalt Base - 2" Asphalt Surface 3. 12-4-2: 12" Base Rock - 4" Asphalt Base - 2" Asphalt Surface o Reclaimed Materials - Salvaged bituminous pavement from Kentucky Department of Highways projects, City of Louisville-Metro projects or other sources, removed by milling or other means, being used in hot bituminous mixtures for all resurfacing projects shall be permitted providing the conditions listed below are met. For other sources to be approved, Contractor shall establish to the City's satisfaction that the material meets Kentucky highway specifications when originally placed, or that the quality of the material is acceptable. 1. Reclaimed materials shall not be used in open graded friction courses, sand asphalt surface, or bituminous concrete surface, unless it is documented to the City's satisfaction that the material meet the aggregate requirements when originally placed. 2. Reclaimed materials shall not be used in bituminous concrete surface in which a minimum amount of polish resistant sand is required, unless it is documented to the City's satisfaction that the material met this requirement when originally placed. 3. Reclaimed materials of different gradation, asphalt percentage, asphalt properties and aggregate properties shall be stockpiled separately and fed through separate cold feeders. Other methods and procedure may be approved by the City provided the Contractor demonstrates that all characteristics of the material remain uniform. 4. The quantity of reclaimed materials used shall be approved by the City. When the reclaimed material is salvaged from projects approved above, the maximum amount that may be used (by weight of total mixture) is 15 to 19 percent. 5. The job mix formula shall be developed by Contractor and, along with samples, proposed to the City for approval in accordance with Kentucky Method 64-427-84 "Method for designing Bituminous Concrete Mixes containing reclaimed Asphalt Pavement." Separate samples will be required of each reclaimed material with different properties, including different aggregate types.

Post-Bid

Municipal

$350,000.00

Public - County

Renovation

83

23

14

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
52
Bidding Soon
1,175
All Active Projects
487
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wake County Office Building 12th & 14th Floors Upfit

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.