BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of an educational facility in New Lebanon, Ohio. Completed plans call for the renovation of a educational facility.

Boiler Replacement Project - Dixie Middle School Questions are to be addressed to Mr. Lance Hoop, Maintenance Director, via email at Ihoop@newlebanonschools.org to provide all with documentation of responses. The facility is located at 200 S. Fuls Rd., New Lebanon, OH. The New Lebanon Local School District is accepting fixed bids for the boiler, materials, and labor to install the new boiler. The district plans on having the project completed during the summer of 2025 if manufacturing lead time allows for completion at that time. It will be the responsibility of the bidder to familiarize themselves with the facility and any or all abnormalities that may be present. Care shall be taken to prevent any damage to existing facilities and to ensure prompt completion to allow usage as needed. The selected company shall provide proof of insurance with liability coverage at a minimum of $1,000,000 and also proof of current workmen's compensation coverage for all employees, and contract labor, that may be on site. The facility is a middle school that uses the boiler for building heating. New Lebanon School District is requesting bids for the purchase and installation of a HYDROTHERM (ATH) HOT WATER CONDENSING BOILER (Model KN-26). Included features: Insulated jacket, Air fuel coupled with modulating negative acting DUNGS gas valve, Flame safeguard control w/ UV flame rectification, Variable speed blower, Interrupted spark ignition; Main gas regulator, Heat Net integrated boiler management system Mod Bus BAS Interface, 7" diagonal touch screen display, Safety pressure relief valve, CSD-1 compliant gas train w/ LWCO, Temperature pressure indicator, Low and high gas pressure switches, Factory installed flow sensor, Boiler Primary Pump 2 hp: Field Installed & Wired, Manual reset high limit, Air vent Spirotop, Condensate drain with fitting; Condensate Neutralization tube. The successful bidder shall be issued a purchase order for the full amount of the bid and no changes to the amount will be allowed once agreed. Payment shall be made in full within 30 days following completion of the project and receipt of an invoice from the vendor. A performance bond will not be required of the successful bidder unless the bidder requires a deposit of funds prior to the completion of the project.

Post-Bid

Educational

$210,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
103
Bidding Soon
2,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

200 S Fuls Rd, New Lebanon, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.