Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Renovation of an educational facility in New Lebanon, Ohio. Completed plans call for the renovation of a educational facility.
Boiler Replacement Project - Dixie Middle School Questions are to be addressed to Mr. Lance Hoop, Maintenance Director, via email at Ihoop@newlebanonschools.org to provide all with documentation of responses. The facility is located at 200 S. Fuls Rd., New Lebanon, OH. The New Lebanon Local School District is accepting fixed bids for the boiler, materials, and labor to install the new boiler. The district plans on having the project completed during the summer of 2025 if manufacturing lead time allows for completion at that time. It will be the responsibility of the bidder to familiarize themselves with the facility and any or all abnormalities that may be present. Care shall be taken to prevent any damage to existing facilities and to ensure prompt completion to allow usage as needed. The selected company shall provide proof of insurance with liability coverage at a minimum of $1,000,000 and also proof of current workmen's compensation coverage for all employees, and contract labor, that may be on site. The facility is a middle school that uses the boiler for building heating. New Lebanon School District is requesting bids for the purchase and installation of a HYDROTHERM (ATH) HOT WATER CONDENSING BOILER (Model KN-26). Included features: Insulated jacket, Air fuel coupled with modulating negative acting DUNGS gas valve, Flame safeguard control w/ UV flame rectification, Variable speed blower, Interrupted spark ignition; Main gas regulator, Heat Net integrated boiler management system Mod Bus BAS Interface, 7" diagonal touch screen display, Safety pressure relief valve, CSD-1 compliant gas train w/ LWCO, Temperature pressure indicator, Low and high gas pressure switches, Factory installed flow sensor, Boiler Primary Pump 2 hp: Field Installed & Wired, Manual reset high limit, Air vent Spirotop, Condensate drain with fitting; Condensate Neutralization tube. The successful bidder shall be issued a purchase order for the full amount of the bid and no changes to the amount will be allowed once agreed. Payment shall be made in full within 30 days following completion of the project and receipt of an invoice from the vendor. A performance bond will not be required of the successful bidder unless the bidder requires a deposit of funds prior to the completion of the project.
Post-Bid
Educational
$210,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
May 12, 2025
200 S Fuls Rd, New Lebanon, OH
Related To This Project
New Lebanon, OH
Bid Date: Jul 23 2025
New Lebanon, OH
Bid Date: Sep 08 2025
New Lebanon, OH
Bid Date: Mar 05 2025
New Lebanon, OH
Bid Date: Mar 07 2025
New Lebanon, OH
Bid Date: Dec 05 2024
New Lebanon, OH
Bid Date: Oct 02 2024
New Lebanon, OH
Bid Date: Feb 29 2024
New Lebanon, OH
--
New Lebanon, OH
Bid Date: Oct 26 2023
New Lebanon, OH
Bid Date: Feb 25 2022
New Lebanon, OH
Bid Date: Dec 15 2021
New Lebanon, OH
Bid Date: Jul 14 2023
New Lebanon, OH
Bid Date: Jun 23 2023
New Lebanon, OH
Bid Date: May 16 2023
New Lebanon, OH
Bid Date: Apr 20 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
