Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2025 at 8:00 PM

Updated May 1, 2025

Site work and paving for a mixed-use development in Spring Hill, Tennessee. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 30, 2025, this project has been awarded to Mastec Civil, LLC with the bid amount of $10,225,697.60. ** This project consists of 0.854 miles of roadway widening, realignment, curb & gutter, underground drainage, sidewalk, shared-use-path, signing, pavement markings, signalization, and traffic control. The intent of the project is to widen Buckner Lane from Duplex Road to north of Wades Crossing. The project includes improvements on Buckner Lane, Duplex Road, Sakari Circle, Nealcrest Circle S, Nealcrest Circle N, Maleventum Way, Belcor Drive, Savannah Park Drive, Wades Crossing, and adjacent driveways. In addition to the roadway improvements, the project includes the installation of one new traffic signal, modifications to one existing traffic signal, and water and sewer line relocations. Each proposal must be accompanied by a bidder's bond, or Cashier's Check, or Certified Check made payable to the CITY OF SPRING HILL in an amount equaling not less than five percent (5%) of the amount bid. In the case of optional items in the proposals, the amount of the bidder's bond or check must be in an amount equaling not less than five percent (5%) of the total amount of the bid based on the high option. Question Deadline 04/02/2025 at 5:00 PM CT All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Engineer, David Corley, PE at Kimley-Horn and Associates, Inc., 10 Lea Avenue, Suite 400, Nashville, TN 37210, David.Corley@kimley-horn.com (by 5:00 PM on April 2 nd , 2025). Information received from other offices of the CITY OF SPRING HILL is strictly advisory.

Award

Roads / Highways

$10,225,698.00

Public - City

Paving, Site Work

249

14

4

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
48
Bidding Soon
1,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

Project location map

Buckner Ln, Spring Hill, TN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed