BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 29, 2025

Demolition and site work for an educational facility in Glenwood, Alberta. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

The old elementary school is a single-story brick and mortar building. The demolition project includes, but is not limited to, the following tasks: The Demolition contractor will assume and perform the duties as the Prime Contractor. The Prime Contractor will be responsible for all staff and work carried out to complete the demolition of the school. Complete demolition of the building structure. Removal and disposal of all debris and materials to off-Reserve facilities. Minimal site work, focusing mainly on the building footprint. Ensuring safety and compliance with all relevant regulations and standards. There are no disposal requirements for this project beyond removal from site. Means of proper disposal off-Reserve is the responsibility of the contractor. All relevant permitting and approvals will be obtained by the Development Manager (Larkspur Projects). Utilizing a reasonable amount of local labour for the completion of the demolition. The scope of work for this project includes and is further noted in the marked-up image on the following page: Temporary construction fencing for the site area is required. Demolition of the building structure. Removal and disposal of all materials. All utilities for this building are decommissioned - gas, water and electricity. In addition to the South Playground equipment salvage items (outlined in orange), the edging should also be removed and set aside - all pea gravel is to be left in place. Assume that both underground cisterns are 15' in depth, with the lengths and widths shown in design plans. All pile caps, foundation walls, mud slabs of crawl spaces, and piles down to 6' below grade must be removed. Any remaining equipment and furniture at the time of demolition is to be recycled or removed as waste. Site cleanup and restoration to a safe and stable condition. Excavations should be filled in with site material surrounding the school, and the area should be levelled off with the surrounding area. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
6
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 14, 2025

Project location map

SE 1/4 (LSD 8) Sec 5 Twp 5 Rge 26 W4M, Glenwood, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.