Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work, paving and new construction of a fire / police facility in Beecher, Illinois. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; and for paving for a fire / police facility.
Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the Village of Beecher, cashiers check, or certified check made payable to Village of Beecher in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of Village of Beecher for a period of sixty (60) days after the scheduled time of closing bids. APPLICABLE REQUIREMENTS The Contractor and its subcontractor(s) shall pay to all laborers, workmen and mechanics performing work on this Project not less than the prevailing rates of hourly wages for work of a similar character in the locality in which the work is performed and not less than general prevailing rate of wages for legal holidays and overtime work in the performance of work under the contract, as established by the Illinois Department of Labor, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1 et. seq.) and with the requirements of the Illinois Employment of Illinois Workers on Public Works Act (30 ILCS 570/.01 et. seq.). If the Department of Labor revises the prevailing rate of hourly wages, the revised rate shall apply to the Contract. The prevailing rates of wages are revised by the Illinois Department of Labor and are available on the Department's official website. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "A- IX" in accordance with Best's Key Rating Guide - Latest Edition. Work on this project will be awarded to one prime contractor per bid package as determined by the Owner. The Contractor shall be required to furnish sufficient insurance to the Village of Beecher against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the Village of Beecher. The Owner reserves the right to reject any and all proposals or bids.
Award
Fire / Police
$67,540.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
April 28, 2025
250 W Church Rd, Beecher, IL
Related To This Project
Beecher, IL
Bid Date: Apr 17 2025
Beecher, IL
Bid Date: Sep 22 2025
Beecher, IL
Bid Date: Sep 23 2025
Beecher, IL
Bid Date: Nov 24 2025
Beecher, IL
Bid Date: Jan 17 2025
Beecher, IL
Bid Date: Mar 27 2024
Beecher, IL
Bid Date: Mar 27 2024
Beecher, IL
Bid Date: Nov 30 2023
Beecher, IL
Bid Date: Jan 24 2024
Beecher, IL
Bid Date: Feb 09 2022
Beecher, IL
Bid Date: Feb 16 2022
Beecher, IL
Bid Date: Jan 19 2022
Beecher, IL
Bid Date: Dec 07 2021
Beecher, IL
Bid Date: Aug 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
