BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Renovation of an educational facility in Edinboro, Pennsylvania. Completed plans call for the renovation of a educational facility.

Questions Due Date: Mar 24th 2025, 1:00 PM EDT Penn West University, of the PA State System of Higher Education invites Contractors to download bid documents for this project. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the Mechanical Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents. Work included in each Separate Prime Contract shall include, but not be limited to, the following: Base Bid #1 shall consist of all General, HVAC, Plumbing, and Electrical Work as shown in the Contract Documents, (Hendricks Hall Boiler Renovation) Base Bid #2 shall consist of all General, HVAC, Plumbing, and Electrical Work as shown in the Contract Documents, (Wiley Hall Chiller Renovation) Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all Construction to the satisfaction of the University, and subject to approval of the Professional and State System of Higher Education. Registration is a free process that takes only a few minutes. Once registered, bidders may obtain all solicitation documents, receive notification of solicitation updates, and submit and update their confidential bids online. 4 Electrical Construction $100,000.00 to $150,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Required with the Contract: Performance & Payment Bond: 100% of awarded Contract Price Maintenance Bonds: 10% of awarded price If a bid security is required, each bid must be accompanied by a certified check, bank cashier's check, or Bid Bond. Bid Result PWED-25002.2 Mechanical Construction - Wm. T. Spaeder Co., Inc. - 467,600 PWED--25002.4 Electrical Construction - Blackhawk Neff Inc - 10,106

Bid Results

Educational

$477,706.00

Public - State/Provincial

Renovation

20

13

12

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
92
Bidding Soon
1,405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 12, 2025

Project location map

219 Meadville St, Edinboro, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.