Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and renovation of a civil project in Ireton, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of May 28, 2025, the project was awarded to West Branch Construction, with an awarded amount of $395,758.01.** Schedule 3W - Construction of one observation well and one water supply production well in the Dakota Sandstone Aquifer approximately 445-feet deep, complete with submersible pump and pitless unit. Schedule 3C - Construction of approximately 1,516-feet of underground10-inchand12-inch PVC water main, well metering vault and building, well power supply, electrical,control, and integration work for a complete functional system. Schedule 3CW - Combination of schedules 3C and 3W. Each bid must be accompanied by bid security payable to the Owner for ten percent (10%) of the total bid if in the form of a Bid Bond, or five percent (5%) if in the form of a certified or bank check. As soon as the bid prices have been compared, the Owner will return the bid security of all except the three lowest, responsive, responsible bidders for each Schedule. The bid security of the two remaining unsuccessful bidders will be retained until the earlier of seven days after the Effective Date of the Agreement or 35 days after the Bid opening. The bid security of the successful bidder will be retained until the contract and surety bond have been executed and approved, after which it will be returned. Est. Completion Date: May 31, 2026 The Owner reserves the right to reject any and all bids or to accept any bid. Contractor's Proposals shall hold firm for thirty-five (35) days from the date ofopening. Mutually agreed upon extensions of time may be made, if necessary. Question Deadline 04/01/2025 Custom bid result Total Bid Schedule 3-W Rieschick Drilling Co. - $1,011,408 Total Bid Schedule 3-C West Branch Construction -$ 395,758

Award

Water / Sewer

$1,407,166.00

Public - County

Renovation, Site Work

26

26

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
63
Bidding Soon
490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 9, 2025

Project location map

To Be Determined, Ireton, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.