Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 22, 2025 at 8:00 PM
Updated April 23, 2025
Site work for a water / sewer project in N Richmond, California. Completed plans call for site work for a water / sewer project.
Online Q&A Yes Q&A Deadline 03/24/2025 5:00 PM (PDT) he City of Richmond is requesting proposals from qualified firms to provide professional engineering & design services to prepare a feasibility study for the Keller Beach Sanitary Sewer Replacement Project. The services required shall include, but are not limited to, project team coordination, public outreach, geotechnical investigation, environmental Compliance and Permit scoping, private sewer lateral feasibility ,generating detailed plans, and estimate for the sewer Replacement, coordination with the City This Request for Proposal (RFP) describes the project, the required scope of services, the consultant selection process, and the required information that must be included in the proposal. Failure to submit information in accordance with the RFP requirements and procedures may be cause for disqualification. The anticipated term of this contract will be for a period of one (1) year. The existing Keller Beach sanitary sewer interceptor pipeline, which serves the Point Richmond community, is in the tidal zone of San Francisco Bay between the Keller Beach pump station and the Chevron wharf. The City will be evaluating the 63-year-old pipeline which is in poor condition and needs to be repaired or replaced. The feasibility study must consider regulatory constraints associated with working within the San Francisco Bay. This includes compliance with environmental permitting requirements from agencies such as the San Francisco Bay Regional Water Quality Control Board (RWQCB), San Francisco Bay Conservation and Development Commission (BCDC), and U.S. Army Corps of Engineers. The study should assess the feasibility of obtaining necessary permits for any alternative that involves work within the Bay, including full replacement of the existing sewer line in its current location. Until an alternative is chosen, the City is under a temporary moratorium for new sewer connections to the Keller Beach sanitary sewer. Existing corridor for the Keller Beach Sanitary Sewer Main Exhibit 1
Bid Results
Water / Sewer
$600,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2025
May 19, 2025
Ocean Ave, N Richmond, CA
Related To This Project
N Richmond, CA
Bid Date: Jul 23 2019
N Richmond, CA
Bid Date: May 14 2025
N Richmond, CA
--
N Richmond, CA
Bid Date: Jun 26 2025
N Richmond, CA
Bid Date: Aug 12 2025
N Richmond, CA
Bid Date: Aug 04 2025
N Richmond, CA
Bid Date: Sep 12 2025
N Richmond, CA
Bid Date: Apr 17 2025
N Richmond, CA
--
N Richmond, CA
Bid Date: Feb 24 2025
N Richmond, CA
Bid Date: Feb 20 2025
N Richmond, CA
Bid Date: Feb 11 2025
N Richmond, CA
Bid Date: Feb 11 2025
N Richmond, CA
Bid Date: Jan 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
