BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a mixed-use development in Ravenna, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Description DBE GOAL 8%: The work included in this project generally includes pavement widening for turn lanes, signal pole, storm improvements, waterline lowering, asphalt grinding involving re-profiling to obtaining minimum cross slope, resurfacing, asphalt base repairs, driveways and sidewalk, existing castings being adjusted or replaced and new pavement markings and signage at this intersection. Location(s) Summit, Ohio Cuyahoga, Ohio Question Deadline 03/30/2025 at 10:00 AM ET Online Questions Submission.

Award

Roads / Highways

$2,697,282.00

Public - City

Paving, Site Work

65

6

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
157
Bidding Soon
2,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 16, 2025

Project location map

Multiple Locations, Ravenna, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.