EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in St Clr Shores, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000379717 This work includes repairs/modifications at two separate locations, the Milk River RTB Chamber and the Milk River Recirculation Pump Station. Vactor Pipe Project at Milk River RTB Chamber This work includes the installation of 6-inch HDPE pipes and their connections, concrete removal and repairs within the chamber, as well as other miscellaneous and related items of work. Gate Replacement Project at Milk River Recirculation Pump Station This work includes the removal and replacement of an existing sluice gate, concrete removal and repairs, as well as other miscellaneous and related items of work. The owner reserves the right to award the Vactor Pipe Project and the Gate Replacement Project to individual or multiple contractors. The Prime Contractor shall demonstrate that they have successfully completed projects in the last five (5) years of equal scope in the State of Michigan. Question Deadline 04/03/2025 at 2:00 PM ET Questions are submitted online No , Please contact Taylor Sting with AEW at tsting@aewinc.com, for any specific questions regarding the bidding documents. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required - Safety Standards Plan Award Requirements - Reserve Rights to Award by Line Item Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Each proposal shall be accompanied by a certified check in the amount of five percent (5%) of the proposal, payable to the Milk River Intercounty Drain Drainage District (MRIDDD), as security for the acceptance of the contract. A bid bond on the Michigan Standard Form, issued by an approved Surety Company, may be furnished in lieu of a certified check. PRE-QUALIFICATIONS Bidder must have at least five (5) years' experience in the Scope of Work described here in these specifications in order to be considered a qualified Bidder. WITHDRAWAL OF BIDS No bidder may withdraw his proposal within sixty (60) calendar days after the date set for opening thereof. This time frame may be adjusted through material agreement between the Owner and Contractor. *The right to accept any bid, to reject any or all proposals and to waive irregularities in bidding is reserved by the MRIDDD. Portions of this Contract may be deleted due to unforeseen circumstances without compensation. Acceptance of any bid does not constitute a binding agreement until a written Contract is signed by both parties.

GC Bidding

Water / Sewer

$400,000.00

Public - County

Site Work

9

12

2

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
125
Bidding Soon
1,538
All Active Projects
738
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

img_map_placeholder

Multiple Locations, St Clr Shores, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Milk River Rtb Vactor Pipe Milk River Recirculation Pump Station Gate Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.