BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated May 14, 2025

This is a service / maintenance or supply contract in St Clr Shores, Michigan. Contact the soliciting agency for additional information.

Reference Number 0000383337 Remove tree stumps located in the road right-of-way throughout the City as directed by the Department of Public Works Forestry Division. Payment for removal is based on DBH taken at the time of the tree removal Question Deadline 05/13/2025 at 12:00 AM ET Questions are submitted online No It is the intent of the City to award a 3-year project on Monday, June 2, 2025. All prices provided shall remain valid until June 30, 2028. Insurance The Contractor shall provide insurance in the name of the City of St. Clair Shores. The City of St. Clair Shores shall be included as additional named insured on this Owners & Contractors Protective Policy All quantities are estimated and may vary substantially during the course of the contract. The estimated quantities are used for assisting in the determination of the lowest responsible bidder. Measurements are taken at diameter breast high (DBH). The measurement will be rounded to the nearest full inch. Stump Removal Remove tree stumps located in the public right-of-way throughout the City as directed by the Department of Public Works Forestry Division. The Contractor shall grind stumps a minimum of 8-10 - inches below grade. All protuberant surface and subsurface roots beyond the stump area, noticeable from visible inspection, shall be removed to a depth of 8-10 - inches below grade. The remaining stump grindings shall be removed, screened topsoil shall be installed and tampered level with the existing grade, and grass seed planted. All stump grindings, excess material and debris shall be removed from the worksite and properly disposed of by the contractor. Clean-Up All debris from stumping operations shall be cleaned up each day before the work crew leaves the site, unless permission is given by the City to do otherwise. All lawn areas shall be raked, all streets and sidewalks shall be swept, and all brush, branches and logs shall be removed from the site. Areas are to be left in a condition equal to that which existed prior to the commencement of tree removal operations. The Contractor guarantees the reimbursement, repair or replacement and restoration of any cultivated area damaged by careless or accidental use of equipment or machinery. Contractor agrees to repair or replace any turf area, fences, signs, poles, and/or appurtenances damaged or destroyed by careless or accidental use of equipment or machinery in the performance of the Contract. Sprinkler Damage Sprinkler damage determined by the Department of Public works as a result of tree and stump removal shall be the responsibility of the Contractor to repair. Sprinkler repairs must be completed within 72 hours of notification during the growing season. Sprinklers damaged in the winter must be repaired by April 15th the following spring. Working Hours The Contractor will schedule work between the hours of 7:00 AM and 7:00 PM, Monday through Friday, unless authorized by the City to do otherwise. Explanations desired by Bidders shall be requested of the Owner, and if explanations are necessary, a reply will be made in the form of an Addendum, a copy of which will be posted to online. Every request for such explanation shall be made to Geoffrey Brown, DPW Supervisor, at 586-445-5363, extension 1602.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
175
Bidding Soon
2,539
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 3, 2025

Project location map

Multiple Locations, St Clr Shores, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.