BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and paving for a mixed-use development in Boardman, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Boardman, Oregon (Owner), is requesting Bids for the construction of the following Project: South Main St. and Loop Rd. Improvements - 2025. The Project includes the following Work: Reconstruction of approximately 2,800 linear feet (LF) of roadway along South Main Street, construction of approximately 3,400 LF of new roadway, 59,200 square feet of sidewalk, and 10,100 LF of curb and gutter; storm drainage improvements; domestic water main improvements; sewer line improvements; and parking improvements, together with all other Work required to complete the Project as specified and as shown on the Drawings. Est. Value Notes: $6.3 to $6.8 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Category Code: Sewer and Water Construction, Miscellaneous, Street/Road Lane Construction and Repair, Water Main (Repair/Replace) Rehabilitation, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Street/Roadway Reconstruction The Project includes the following Work: Reconstruction of approximately 2,800 linear feet (LF) of roadway along South Main Street, construction of approximately 3,400 LF of new roadway, 59,200 square feet of sidewalk, and 10,100 LF of curb and gutter; storm drainage improvements; domestic water main improvements; sewer line improvements; and parking improvements, together with all other Work required to complete the Project as specified and as shown on the Drawings. Additional Description: The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law. The Project has an expected duration of 210 calendar days. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. or at the location listed below. City of Boardman, 200 City Center Circle The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses should indicate they are a minority on the Planholders List. The City is willing to accept clean fill dirt at their wastewater treatment facility located approximately 3 miles east of the project site. All other material needing to be disposed of will be the responsibility of the contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$4,921,988.00

Public - City

Paving, Site Work

118

45

60

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
19
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 3, 2025

Project location map

S Main St, Boardman, OR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.