BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated April 25, 2025

Renovation of an educational facility in Louisville, Kentucky. Completed plans call for the renovation of a educational facility.

Question Deadline 04/01/2025 at 12:00 PM ET Painting - repainting the walls in select rooms and corridors to give them a fresh look. o Flooring - replacing old or damaged flooring with new materials. o Lighting - upgrading the lighting systems to improve visibility and energy efficiency. o Exterior Lighting - adding exterior lighting to improve safety and aesthetics. o Furniture Replacement - replacing old or damaged furniture with new, functional pieces. o Classroom Reconfiguration - reconfiguring current classrooms to better fit the class schedule needs, which includes the following: Demolition of walls to redesign student-facing spaces. Framing of new walls Drywall Soffits Addition - adding soffits to corridors for improved design and functionality Restrooms - ensure accessibility and adequate fixture counts, and update finishes within the current layout wherespace limits. Provide alternate designs for gender neutral restroom after fixture counts are met. Ensure they meet current standards. o System Upgrades - upgrading essential building systems to include the following: HVAC (Heating, Ventilation, and Air Conditioning): Replacement or refurbishment of all air systems and building hydronic system which is fed by the central steam and chilled water plant; design to include heat recovery chiller for energy efficiency and thermal comfort improvements Electrical systems: Primary switchgear and distribution Sprinkler systems Audio Visual Installation: Installing new and integrating current audio-visual equipment to enhance the learning experience Owner Furnished Contractor Installed (OFCI) - Pre-Ordered Equipment The awarded DBC will be responsible for receiving, storing, inventorying, transporting, protecting, and installing the following OFCI equipment/furnishings: One (1) Electrical Switchgear Owner Furnished Owner Installed (OFOI) Selected toilet accessories Furniture Audio/Video Equipment

Post-Bid

Educational

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
144
Bidding Soon
1,688
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 12, 2025

Project location map

201 E W Shipp Ave, Louisville, KY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.