Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 25, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Millbrook, Alabama. Completed plans call for site work for a water / sewer project.
The project includes the following work: WWTF improvements consisting of a new concrete digestor, screw press, blowers, chemical feed equipment, piping, electrical, Scada and related appurtenances. This Project is Being Funded by Srf Project No: Cs011059-01 and Will Require Dbe Documentation From the Low, Responsive, Responsible Bidder No Later Than 10 Days After the Bid Opening. This Project is Being Supported, in Whole or in Part, by Federal Award Number Slfrp2635 Awarded to the State of Alabama by the U. S. Department of Treasury. All Participants Must Comply With All Federal Requirements Applicable to the Loan (Including Those Imposed by the 2014 Appropriations Act and Related SRF Policy Guidelines) Which the Participant Understands Includes, Among Other, Requirements That All of the Iron and Steel Products Used in the Project Are to Be Produced in the United States ("American Iron and Steel Requirement") and Those Imposed by the Build America, Buy America (Baba) Requirements. All Bidders Shall Submit, Upon Request, a List of Projects "Successfully Completed" in the Last 2 Years, Having the Same Scope of Work and Approximate Construction Cost as Specified in This Project. All Bidders Must Comply With Requirements of the Contractor's Licensing Law of the State of Alabama and Be Certified for the Type of Work on Which the Proposal is Submitted. Each Bidder Must Deposit With His Bid, Security in the Amount, Form and Subject to the Conditions Provided in the Instructions to Bidders. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975, and Must Show Evidence of License Before Bidding or Bid Will Not Be Received or Considered by the Engineer; the Bidder Shall Show Such Evidence by Clearly Displaying the License Number on the Outside of the Envelope in Which the Proposal is Delivered. Bidders Will Be Fully Responsible for the Delivery of Their Bids in a Timely Manner. Reliance Upon U.S. Mail or Other Carriers is at the Bidder's Risk. Late Bids Will Not Be Considered. No Bidder May Withdraw His Bid Within 60 Days After the Opening Thereof. Document note: Copies of the Bidding Documents May Be Obtained From the Issuing Office, During the Hours Indicated Above, Upon Payment of $20.00 for a One-time Administrative Fee for Digital Access/file Sharing and/or $100.00 for Each Printed Set. Said Cost Represents the Cost of Printing, Reproduction, Handling, and Distribution, Therefore No Refund Will Be Granted. Checks for Bidding Documents Shall Be Payable to "GMC." Partial Sets of Bidding Documents Will Not Be Available From the Issuing Office. Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda if Any, Obtained From Sources Other Than the Issuing Office. Bid Security Shall Be Furnished in Accordance With the Instructions to Bidders. The Owner Reserves the Right to Waive Any Informalities, or to Reject Any or All Bids, and to Award the Contract to the Lowest, Responsive, and Responsible Bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
May 23, 2025

To Be Determined, Millbrook, AL
Related To This Project
Millbrook, AL
Bid Date: Mar 11 2025
Millbrook, AL
Bid Date: Mar 06 2025
Millbrook, AL
--
Millbrook, AL
--
Millbrook, AL
Bid Date: Aug 07 2024
Millbrook, AL
Bid Date: Aug 07 2024
Millbrook, AL
Bid Date: Oct 03 2024
Millbrook, AL
Bid Date: May 29 2024
Millbrook, AL
Bid Date: May 09 2024
Millbrook, AL
Bid Date: Mar 29 2024
Millbrook, AL
Bid Date: Feb 14 2024
Millbrook, AL
Bid Date: Nov 17 2023
Millbrook, AL
Bid Date: Mar 17 2022
Millbrook, AL
Bid Date: Dec 20 2021
Millbrook, AL
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.