BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 1, 2025

Site work and paving for a road / highway in South Jordan, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 30, 2025, this project has been awarded to Black Forest Paving but the awarded amount is not available.** Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation The City of South Jordan seeks proposals from experienced and qualified Contractors to provide Asphalt Overlay construction for the Citys 2025 Overlay projects. Questions Due Date: Mar 18th 2025, 12:00 PM MDT Any changes or clarifications will be made through the Addendum process through BONFIRE. It is the responsibility of the Vendor to check and ensure they have examined all addendum(s) or questions. The City is not responsible for any Vendors whose Bids do not take into consideration updated information released through the Q&A function in BONFIRE or through any addendums added through BONFIRE. Each construction season the city does regular roadway maintenance, and a portion of that maintenance is to mill and overlay asphalt street sections, trails, and parking lots. The collector streets and arterials receive a 2" mill and 2" overlay of PG64-34 Super Pave mix, the UDOT super pave mix. The city is looking for a contractor that can provide the required materials and excellent work for our overlay projects for this coming year. The Work locations for overlay are outlined on the attached maps for 3200 West and 9800 South and South Jordan Parkway. The work Includes a 2" Mill and 2" overlay PG 64-34 UDOT Spec Superpave Mix.The overlay areas as outlined on the reference maps will follow specified standards and generally include, but are not limited to 2" Full Width and/or Lane Milling, Delivery, Placement, and Compaction of 2" Superpave Asphalt Overlay; Lower and Raise Monuments, Valves, Sewer, Storm and Water Manhole Lids to Grade; Replace Existing Striping per striping plans; Tree trimming and any other Materials and Labor necessary to complete the job based on construction plans. The work must be substantially complete 45 days from Notice to Proceed. The OWNER anticipates a Notice to Proceed will be given on July 1st 2025.

Award

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

32

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
69
Bidding Soon
1,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

July 1, 2025

Project location map

Multiple Locations, South Jordan, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.