BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated April 4, 2025

This is a service / maintenance or supply contract in Columbia Falls, Montana. Contact the soliciting agency for additional information.

03/19/2025 - Amendment 0001 changes the following: 1. Adds language to p. 2, section (vi) Description of Requirement of 1284LM25Q0011 AMD 0001.docx, which allows for alternate palliative products. 2. Removes clauses (p. 12) and adds Class Deviations (pp. 9, 10 & 13) from 1284LM25Q0011 AMD 0001.docx per Executive Orders 14173, 14168 and Section 2 of Executive Order 14148 (which revoked Executive Order 14057 and Section 2 of Executive Order 14208). Changes are highlighted in green. Please sign and return "SF-30 AMD 0001.pdf" with your offer to acknowledge Amendment 0001. This project is focused on blading and applying a dust palliative to the road at the West Glacier River access site in West Glacier, MT. Dust abatement will occur at the site each year between June 1 and July 15 once the need has been determined. Dust abatement is an important service provided at West Glacier River access site as it is the most heavily used river access site on the North and Middle Forks of the Flathead. Both commercial river outfitters and private users regularly use this site from June to September. It is also located adjacent to a residential community; with the high vehicle use, dust becomes a prevalent nuisance to both users and neighbors. See Attachments 2 and 3 for technical specifications for dust abatement: FP-14 Dust Palliative Mixtures (green highlight) and FP-14 Dust Palliative Spec. The application area will include both parking areas, the loop road, and the area leading to the boat ramp at West Glacier. Work to be included is blading the road prior to application of the dust palliative. The road is approximately 0.2 miles long and typically has required ~7 tons of dust palliative. A map of the access site and its location is also provided (Attachment 1). Please see attachment 1284LM25Q0011.docx for submittal instructions. Questions regarding this solicitation are due no later than March 21, 2025, COB to joanne.meiers@usda.gov. Proposed Period of Performance: Base Year: June 1, 2025, through May 31, 2026 Option Year 1: June 1, 2026, through May 31, 2027 Option Year 2: June 1, 2027, through May 31, 2028 Option Year 3: June 1, 2028, through May 31, 2029 Option Year 4: June 1, 2029, through May 31, 2030

Post-Bid

Roads / Highways

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
66
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 1, 2025

Project location map

Multiple Locations, Columbia Falls, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.