BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Demolition, site work, paving, new construction, remodeling and addition to a mixed-use development in Columbia Falls, Montana. Design plans call for the remodel of a educational facility; for the addition of a educational facility; fitness / recreation center; for paving for a sidewalk / parking lot; and laboratory facility.

The new remodel adds about 30,000 square feet to the school for instructional space, including two new shop classes (machining and automotive), an expanded Little Theater and the move of art classes into the main building. The old art annex would be moved south of the bus garage and used for offices. The school would get new heating and ventilation, sprinkler systems, secure entrances, wiring and the walls and windows of the 65-year-old building, which leak heat like a sieve, would be replaced. Right now the school has about 32 entranceways. The new plan would cut that number down to less than 10 and still meet fire codes. The Little Theater would be gutted and rebuilt to accommodate 650 people. Right now current seating is 415 and with some concerts, parents have to stand in the hallway or outside entirely. The gym and locker rooms would be remodeled and gym seating capacity would be risen to 2,900-plus seats, making it large enough for divisional tournaments. The gym, with some reconfiguration, can accommodate more seating without a great expense. A track will go around the upper part of the gym and classrooms would be added to the north and locker rooms on the west side. The gym would also have exterior hallways, making it far more secure than it is now, as the doors are often left propped open as in some cases, it’s the only way to get into the west side of the school. As of March 25, 2026, preliminary plans are in progress. A construction start date has not been announced.

Design

Educational

$75,900,000.00

Public - City

Addition, Demolition, New Construction, Paving, Remodeling, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

610 13th St W, Columbia Falls, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.