BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work and paving for a mixed-use development in Orange City, Iowa. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Work generally consists of approximately 2,400 LF of PCC sidewalk, including but not limited to: - Grading, Excavation and Modified Subbase - Adjustment of Sanitary Sewer Manhole - 5, 6 P.C. Concrete Sidewalk - Storm Sewer Improvements - Temporary Traffic Control - Erosion Control Items - Safety Railing - Box Culvert Extension See Bid Form for exact quantities. Site Directions: Along the east side of St. Paul Avenue SE from Iowa Highway 10 to 2nd Street SE. Est. Completion Date: Aug. 15, 2025 Question Deadline 03/26/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

50

13

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
61
Bidding Soon
553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

Project location map

St Paul Ave SE, Orange City, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.