Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work and paving for a sidewalk / parking lot in Orange City, Iowa. Completed plans call for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

As of July 15, 2025, the project was awarded to Vander Windt & Sons, with an awarded amount of $126,775.80. Work generally consists of approximately 1830 LF of 5" PCC sidewalk, including but not limited to: - Grading, Excavation and Modified Subbase - 5", 6" P.C. Concrete Sidewalk - 6" P.C Driveway - 8" Curb and Gutter Improvements - Sidewalk Removals - Erosion Control Items Question Deadline 06/24/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing PRE-BID CONFERENCE 6.01 N/A The work shall be completed as follows: Work shall be substantially completed by September 30, 2025 Site Directions: Project will take place in the confines of Veterans Park in Orange City, IA Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. The right to accept or reject any or all bids and to waive informalities is reserved.

Award

Sidewalks / Parking Lot

$126,776.00

Public - City

Paving, Site Work

25

11

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

July 31, 2025

Project location map

906 5th St SW, Orange City, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.