EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Ozark, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Scope of Work includes the construction of approximately 55,000 square yard of single-layer micro-surface asphalt pavement and 9,000 square yards of double-layer micro-surface asphalt, 170 square yards of full-depth structural pavement repair, erosion control, pavement striping, site preparation including pavement cleaning and brush clearing, traffic control, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. The City of Ozark anticipates issuing notice to proceed in May 2025 The Owner Intends to Award the Contract to the Most Responsive, Responsible Bidder Submitting the Lowest Bid. the Owner Reserves the Right to Reject Any and All Bids.

Award

Roads / Highways

$343,816.00

Public - City

Paving, Site Work

48

7

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees, Planting Accessories, Planters

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
29
Bidding Soon
441
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Ozark Street Resurfacing City of Ozark

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.