BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a mixed-use development in Cambridge, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: The project includes rehabilitation of approximately 445 lf of existing roadway between W. Water Street & Spring Street. Road rehabilitation work includes pulverizing existing asphaltic pavement, regrading the combined pulverized pavement and existing gravel base course, removal of any excess base material, proof roll of roadway base and any required undercut, and placement of new asphaltic pavement. Project work also includes removal of existing ribbon & standard concrete curb, removal of existing concrete sidewalk ramps, and construction of new concrete curb & curb ramps. There are (6) existing storm structures along Spring Water Alley that will require tuck pointing and sealing of the existing pipe collars. These storm structures will be brought to proposed grade with new adjustment rings. One storm structure will require a new concrete lid and storm sewer will be extended and relaid for a portion of the project. Question Deadline 03/21/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services, Inc., Josh Meyerhofer PE, jmeyerhofer@msa-ps.com; Questions received less than seven days prior to the date for opening of Bids may not be answered. Two bid alternatives shall be considered in conjunction with this project: Bid Alternate #1 includes removal of existing asphaltic pavement from the angled parking stalls adjacent to Spring Water Alley followed by new asphaltic paving of the parking area. Bid Alternate #2 includes removal of existing asphaltic pavement from the parking lot adjacent to Spring Water Alley followed by new asphaltic paving of the parking lot. The anticipated substantial completion date is October 1, 2025 and final completion date is November 15, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$136,632.00

Public - City

Paving, Site Work

12

16

2

9

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
220
Bidding Soon
2,570
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

Spring Water Alley, Cambridge, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.