BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 28, 2025

Site work for a water / sewer project in Canton, Illinois. Completed plans call for site work for a water / sewer project.

D The proposed Work is officially known as the "City of Canton Lake Canton Dam 2025 Spillway Repairs" and is further described as follows: Mobilization and Demobilization; Spillway Concrete Repairs: Concrete removal, removal of unsuitable material, aggregate backfill, furnishing and placing reinforcement steel, concrete placement; Pressure Grouting: Pressure grouting to fill subsurface voids; and Restoration and Clean-up. A Bid tabulation will be sent to the Bidders at a later date. The OWNER reserves the right to waive irregularities, informalities and to reject any and all Bids. Unless all Bids are rejected, award shall be made to the lowest responsible bidder as determined by the unit cost bids.

Post-Bid

Water / Sewer

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
61
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

Project location map

To Be Determined, Canton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.